Print Report | Back to Sample Detail

Sample Record for 2015-03-13-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 208945 DEA: 07288604 EFIS: 0700021080 COOP: 074663 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-710-6.0-9.4
Work Description: Gerald Desmond Bridge Replacement - A Design Build project. IQA samples will be selected by Port/Caltrans representatives and sent to Translab for testing.
Location Description: Port of Long Beach (District 7)
Contractor Name: Shimmick/FCC/Impregilo (SFI) JV
Contractor Address: 11 Golden Shore, Suite 330, Long Beach, CA 90802
Resident Engineer: Structure Rep.:

Sample Information

DIME Sample ID: 2015-03-13-1
TL Number from the TL Form: 146297
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Quality Control
Type of Material: Concrete
Sample Taken Date: 03/13/2015
Date that the sample was received by the laboratory/organization performing the testing: 03/17/2015
The quantity of what the sample constitutes: 2
A brief description of the sample: 6X12 cylinders
From where was the sample collected: Job Site
Laboratory sample identification: Unknown
Structure unique identifier: Unknown
Structure name: C32 pile cap
The fabricator/manufacturer/facility name: RT710

Material Information

The concrete mix design number: SFI-PCV
The truck number from where the sample was collected: 370
The batch plant ticket number from where the sample was collected: 4654723
Concrete batch plant: Unknown
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: Ocean Blvd to SR 47 in longbeach
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2015-03-13-1-1CTM 521-November 2014: Method of Test for Compressive Strength of Molded Concrete Cylinders03/17/201504/10/2015Friday OfoegbuCT D08 - Fontana Southern Regional Laboratory28 days