Print Report | Back to Sample Detail

Sample Record for 2022-04-18-63

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215148 DEA: 081E8404 EFIS: 0814000113 QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV,SBD-62-R6.7/9.2,0.0/15.1,29.3/33.6
Work Description: REPLACE ROADWAY WITH RHMA-G AND HMA.
Location Description: IN RIVERSIDE AND SAN BERNARDINO COUNTIES IN AND NEAR YUCCA VALLEY AND IN TWENTYNINE PALMS FROM 0.2 MILE NORTH OF INDIAN CANYON DRIVE TO 0.6 MILE WEST OF UTAH TRAIL
Contractor Name: Matich Corporation
Contractor Address: P.O. Box 50,000, San Bernardino, CA 92412
Resident Engineer: Khoi Vu Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2022-04-18-63
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Acceptance
Type of Material: Aggregate
Sample Taken Date: 04/18/2022
Date that the sample was received by the laboratory/organization performing the testing: 04/18/2022
The quantity of what the sample constitutes: 1 Bag Combined Aggregate 231.45 tons out
A brief description of the sample: 3/4" RHMA-G
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Matich Cabazon

Material Information

Source Identification (SMARA, name of Pit or Job Site): 91-33-0008
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: Belt
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 3/4 inch
The concrete mix design number:
Lot number:
Sublot number:
Aggregate Mix Number:

Test Results

Test 1 of 1

DIME Test ID: 2022-04-18-63-1
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Verified Date: 06/17/2022
Date Tested: 04/19/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
What type of gradation is being tested? Combined Gradation
Cumulative percent passing the 2 in. sieve 0 %
Cumulative percent passing the 1 1/2 in. sieve 0 %
Cumulative percent passing the 1 in. sieve 0 %
Cumulative percent passing the 3/4 in. sieve 97 %
Cumulative percent passing the 1/2 in. sieve 88 %
Cumulative percent passing the 3/8 in. sieve 75 %
Cumulative percent passing the #4 sieve 40 %
Cumulative percent passing the #8 sieve 22 %
Cumulative percent passing the #16 sieve 16 %
Cumulative percent passing the #30 sieve 12 %
Cumulative percent passing the #50 sieve 8 %
Cumulative percent passing the #100 sieve 5 %
Cumulative percent passing the #200 sieve 3 %