Print Report | Back to Sample Detail

Sample Record for 2022-06-03-20

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-10-0.0/13.2
Work Description: Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location Description: LA/SBD County Line to PM 13.2 near I-15
Contractor Name: Lane-Security Paving Joint Venture
Contractor Address: 3450 Centre Lake Drive, 1st Floor, Ontario, CA 91761
Resident Engineer: Jose Corona Structure Rep.: Luis Negrete

Sample Information

DIME Sample ID: 2022-06-03-20
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Barstow Field Laboratory 1
Sample Organization Contact: (760) 252-9216
Type of Sample: Quality Assurance
Type of Material: Soil
Sample Taken Date: 06/03/2022
Date that the sample was received by the laboratory/organization performing the testing: 06/03/2022
The quantity of what the sample constitutes: 9690SQF
A brief description of the sample: Soil
From where was the sample collected: Job Site
Laboratory sample identification: 06032022 TEST 05
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CTM 231 TEST LOCATION

Material Information

The fabricator's/manufacturer's product name for the sample: omar G G
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: AT THE JOB SITE
Where the material sample would have been placed if not sampled:

Test Results