Print Report | Back to Sample Detail

Sample Record for 2022-05-16-26

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214819 DEA: 07288304 EFIS: 0700021024 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-60,60,164,210-Var
Work Description: STORM WATER MITIGATION
Location Description: LOS ANGELES COUNTY AT VARIOUS LOCATIONS
Contractor Name: CHUMO CONSTRUCTION INC
Contractor Address: 14425 Joanbridge St, Baldwin Park, CA 91706
Resident Engineer: Sushilkumar Chaudhari Structure Rep.: Pratheep Piratheepan

Sample Information

DIME Sample ID: 2022-05-16-26
TL Number from the TL Form: 0516B2
Sample Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Sample Organization Contact: (213) 817-0387
Type of Sample: Department Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 05/16/2022
Date that the sample was received by the laboratory/organization performing the testing: 05/16/2022
The quantity of what the sample constitutes: 60 tons
A brief description of the sample: 3/4" RHMA-G 106835 AAA Corona
From where was the sample collected: Manufacturer
Laboratory sample identification: 22-0129
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: AAA Corona

Material Information

HMA Type: RHMA-G
HMA Grading: 3/4 inch
Lot number:
Sublot number:
HMA Mix Number:

Test Results

Test 1 of 2

DIME Test ID: 2022-05-16-26-1
Test Method: AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Organization Address: 1940 South Workman Mill Road,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90601
Organization Email: chad.chotibhongs@dot.ca.gov
Organization Phone: (213) 817-0387
Data has not been verified.

Test 2 of 2

DIME Test ID: 2022-05-16-26-2
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 05/18/2022
Date Tested: 05/18/2022
Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Organization Address: 1940 South Workman Mill Road,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90601
Organization Email: chad.chotibhongs@dot.ca.gov
Organization Phone: (213) 817-0387
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used? Fahrenheit
Test procedure used? Method A
Mass of the specimen basket assembly no data
Mass of the specimen and specimen basket assembly prior to ignition no data
Mass of HMA Sample prior to ignition 2042.3 g
Corrected Asphalt Binder Content 7.10 %
Mass Loss no data
Mass of aggregate remaining after ignition 1896.7 g
Correction Factor (Percent by mass of HMA Specimen) 0.03 %
Moisture Content 0.00 %
Temperature Compensation Factor no data
Test Temperature 1000.4 F