Print Report | Back to Sample Detail

Sample Record for 2022-03-17-69

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369 QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-I-15,SR-91-6.1-7.6
Work Description: I-15 ELC: 15/91 Express Lanes Connector Project (ELC)
Location Description: Junction of I-15 and SR-91 in Corona, CA
Contractor Name: Myers-Rados Joint Venture
Contractor Address: 629 N. Main Street, Suite C3, Corona, CA 92878
Resident Engineer: Roy Fisher Structure Rep.: Alhakem Alina

Sample Information

DIME Sample ID: 2022-03-17-69
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Field Testing Laboratory
Sample Organization Contact: 9512323690
Type of Sample: Acceptance
Type of Material: Concrete
Sample Taken Date: 03/17/2022
Date that the sample was received by the laboratory/organization performing the testing: 03/18/2022
The quantity of what the sample constitutes: 4 Beams
A brief description of the sample: Concrete beams
From where was the sample collected: Job Site
Laboratory sample identification: 10JA1, 10JA2, 10JB1, 10JB2
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Cemex, Fontana

Material Information

The concrete mix design number: 1605762
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: TTI
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: On Job Site at Concrete Truck
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results