Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 215315 DEA: 081H8304 EFIS: 0817000139
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD,SBD-138-0/2.3
Work Description: CONSTRUCT 4' MEDIAN
Location Description: SAN BERNARDINO COUNTY ALONG ROUTE 138
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 213 E Columbia Way, Lancaster, CA 93552
Resident Engineer: Mauricio Santa Cruz Structure Rep.: Unknown
DIME Sample ID: 2022-03-25-18
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 03/25/2022
Date that the sample was received by the laboratory/organization performing the testing: 04/05/2022
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0204-22
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite-Big Rock
Performance Grade: PG 64-28 M
Modified: Yes
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2022-03-25-18-1
Test Method: AASHTO T228-09r13: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 04/11/2022
Date Tested: 04/06/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
DIME Test ID: 2022-03-25-18-2
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 04/11/2022
Date Tested: 04/06/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers?
|
Two
|
Any material loss from containers during heating process/testing?
|
No
|
Mass of empty container #1
|
167.293 grams
|
Mass of empty container #2
|
169.569 grams
|
Mass of container #1 before test (m1i)
|
202.165 grams
|
Mass of container #2 before test (m2i)
|
204.252 grams
|
Mass of container #1 after test (m1f)
|
202.122 grams
|
Mass of container #2 after test (m2f)
|
204.208 grams
|
Average mass change
|
-0.125 percent
|
DIME Test ID: 2022-03-25-18-3
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 04/11/2022
Date Tested: 04/06/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
Original binder
|
Phase Angle (δ) (for the 10 cycles)
|
68.7 degree
|
Dynamic Shear, G*/sin(δ)
|
1.49 kPa
|
(G*) x sin(δ)=
|
no data
|
DIME Test ID: 2022-03-25-18-4
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 04/11/2022
Date Tested: 04/06/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
RTFO residue
|
Test Plate Diameter
|
25 mm
|
Phase Angle (δ) (for the 10 cycles)
|
65.6 degree
|
Dynamic Shear, G*/sin(δ)
|
2.77 kPa
|
DIME Test ID: 2022-03-25-18-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 04/11/2022
Date Tested: 04/06/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s?
|
Pa-s
|
Time of test
|
8:35 HH:MM
|
Test Temperature
|
135 C
|
Speed
|
50 rpm
|
Spindle size
|
21 in
|
Torque
|
86 %
|
Viscosity reading #1 (A)
|
0.868 Pa-s
|
Viscosity reading #2 (B)
|
0.869 Pa-s
|
Viscosity reading #3 (C)
|
0.864 Pa-s
|
Average viscosity
|
0.867 Pa-s
|
DIME Test ID: 2022-03-25-18-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 04/11/2022
Date Tested: 04/06/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation?
|
NA
|
Soluble, percent
|
0.7 %
|
Insoluble, percent
|
99.3 %
|
DIME Test ID: 2022-03-25-18-7
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 04/28/2022
Date Tested: 04/28/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
% Elongation Recovery
|
80 %
|
DIME Test ID: 2022-03-25-18-8
Test Method: AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 05/17/2022
Date Tested: 04/27/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Time test started
|
no data HH:MM:SS
|
Flags issued by software during test
|
no data
|
Correlation coefficient (R²)
|
0
|
Regression coefficient a
|
no data
|
Regression coefficient b
|
no data
|
Regression coefficient c
|
no data
|
Load at time 0.0
|
0.0 mN
|
Deflection at time 0.0 s
|
0.000 µm
|
Load at time 0.5 s
|
0.0 mN
|
Deflection at time 0.5 s
|
0.000 µm
|
Load at 60.0 s
|
0.0 mN
|
Beam deflection 60.0 s
|
0.000 µm
|
Measured Stiffness Modulus 60.0 s
|
46.700 mPa
|
Estimated Stiffness Modulus 60.0 s
|
no data
|
Difference between stiffness moduli 60.0 s
|
no data
|
Estimated m-value 60.0 s
|
0.302
|
DIME Test ID: 2022-03-25-18-9
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 05/17/2022
Date Tested: 04/27/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
PAV residue
|
Test Plate Diameter
|
8 mm
|
Phase Angle (δ) (for the 10 cycles)
|
46.7 degree
|
(G*) x sin(δ)=
|
1980 kPa
|