Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 993222 DEA: 081G5204 EFIS: 0816000020
QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-18-100.9/115.9
Work Description: COLD PLANE AC PAVEMENT & PLACE HMA AND MINOR CONCRETE.
Location Description: SAN BERNARDINO COUNTY IN AND NEAR ADELANTO FROM LOS ANGELES COUNTY LINE TO ROUTE 395
Contractor Name: SULLY - MILLER CONTRACTING COMPANY
Contractor Address: 135 S STATE COLLEGE BLVD. 400, BREA, CA 92821
Resident Engineer: Mauricio Santa Cruz Structure Rep.: Unknown
DIME Sample ID: 2022-03-08-24
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 03/08/2022
Date that the sample was received by the laboratory/organization performing the testing: 03/21/2022
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0174-22
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Blue Diamond Materials-Victorville
Performance Grade: PG 58-34 M
Modified: Yes
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2022-03-08-24-1
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 03/30/2022
Date Tested: 03/23/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s?
|
Pa-s
|
Time of test
|
9:50 HH:MM
|
Test Temperature
|
135 C
|
Speed
|
20 rpm
|
Spindle size
|
21 in
|
Torque
|
87 %
|
Viscosity reading #1 (A)
|
2.18 Pa-s
|
Viscosity reading #2 (B)
|
2.187 Pa-s
|
Viscosity reading #3 (C)
|
2.193 Pa-s
|
Average viscosity
|
2.187 Pa-s
|
DIME Test ID: 2022-03-08-24-2
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 03/30/2022
Date Tested: 03/23/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation?
|
Evaporation
|
Soluble, percent
|
0.5 %
|
Insoluble, percent
|
99.5 %
|
DIME Test ID: 2022-03-08-24-3
Test Method: AASHTO T228-09r13: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 03/30/2022
Date Tested: 03/23/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
DIME Test ID: 2022-03-08-24-4
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 03/30/2022
Date Tested: 03/23/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
RTFO residue
|
Phase Angle (δ) (for the 10 cycles)
|
62.7 degree
|
Dynamic Shear, G*/sin(δ)
|
4.75 kPa
|
(G*) x sin(δ)=
|
no data
|
DIME Test ID: 2022-03-08-24-5
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 03/30/2022
Date Tested: 03/23/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
Original binder
|
Test Plate Diameter
|
25 mm
|
Phase Angle (δ) (for the 10 cycles)
|
62.0 degree
|
Dynamic Shear, G*/sin(δ)
|
2.98 kPa
|
DIME Test ID: 2022-03-08-24-6
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 03/30/2022
Date Tested: 03/23/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers?
|
Two
|
Any material loss from containers during heating process/testing?
|
No
|
Mass of empty container #1
|
172.984 grams
|
Mass of empty container #2
|
167.914 grams
|
Mass of container #1 before test (m1i)
|
208.303 grams
|
Mass of container #2 before test (m2i)
|
202.706 grams
|
Mass of container #1 after test (m1f)
|
208.294 grams
|
Mass of container #2 after test (m2f)
|
202.696 grams
|
Average mass change
|
-0.027 percent
|
DIME Test ID: 2022-03-08-24-7
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 04/19/2022
Date Tested: 03/29/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
% Elongation Recovery
|
88 %
|
DIME Test ID: 2022-03-08-24-8
Test Method: AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 04/19/2022
Date Tested: 04/18/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Time test started
|
no data HH:MM:SS
|
Flags issued by software during test
|
no data
|
Correlation coefficient (R²)
|
0
|
Regression coefficient a
|
no data
|
Regression coefficient b
|
no data
|
Regression coefficient c
|
no data
|
Load at time 0.0
|
0.0 mN
|
Deflection at time 0.0 s
|
0.000 µm
|
Load at time 0.5 s
|
0.0 mN
|
Deflection at time 0.5 s
|
0.000 µm
|
Load at 60.0 s
|
0.0 mN
|
Beam deflection 60.0 s
|
0.000 µm
|
Measured Stiffness Modulus 60.0 s
|
119.000 mPa
|
Estimated Stiffness Modulus 60.0 s
|
no data
|
Difference between stiffness moduli 60.0 s
|
no data
|
Estimated m-value 60.0 s
|
0.312
|
DIME Test ID: 2022-03-08-24-9
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 04/19/2022
Date Tested: 04/18/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 9098293029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
PAV residue
|
Test Plate Diameter
|
8 mm
|
Phase Angle (δ) (for the 10 cycles)
|
42.0 degree
|
(G*) x sin(δ)=
|
1390 kPa
|