Project ID: 993183 DEA: 031H2704 EFIS: 0316000082
QA Service Level: 1
DIST-CO-RTE-PM: 03-YUB-70-R11.2/13.5
Work Description: UPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER.
Location Description: YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD
Contractor Name: BRIDGEWAY CIVIL CONSTRUCTORS, INC.
Contractor Address: 4950 Allison Parkway, # A, Vacaville, CA 95688
Resident Engineer: Selvendran Manoharan Structure Rep.: Brent Bullard
DIME Sample ID: 2022-01-21-47
TL Number from the TL Form:
Sample Submitted By Organization: CT D03 - Olivehurst Northern Regional Laboratory
Sample Organization Contact: (530) 741-4238
Type of Sample: Verification
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 01/21/2022
Date that the sample was received by the laboratory/organization performing the testing: 02/10/2022
The quantity of what the sample constitutes: 2 Bags of RAP
A brief description of the sample: 1/2" Rap
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: KRC HALLWOOD Drum Plant
DIME Test ID: 2022-01-21-47-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 03/22/2022
Date Tested: 02/10/2022
Submitted By Organization: CT D03 - Olivehurst Northern Regional Laboratory
Organization Address: 5330 Arboga Road,
Organization City: Olivehurst
Organization State: CA
Organization Zipcode: 95961
Organization Email: jeff.herbert@dot.ca.gov
Organization Phone: (530) 741-4238
General Comments for this Test: JMF 22-001
Test Result Compliance:
Additional Comments When Verified:
What temperature unit is used?
|
Fahrenheit
|
Test procedure used?
|
no data
|
Mass of HMA Sample prior to ignition
|
no data
|
Corrected Asphalt Binder Content
|
5.38 %
|
Mass Loss
|
no data
|
Correction Factor (Percent by mass of HMA Specimen)
|
no data
|
Moisture Content
|
no data
|
Temperature Compensation Factor
|
no data
|
Test Temperature
|
no data
|
DIME Test ID: 2022-01-21-47-2
Test Method: AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 03/22/2022
Date Tested: 02/10/2022
Submitted By Organization: CT D03 - Olivehurst Northern Regional Laboratory
Organization Address: 5330 Arboga Road,
Organization City: Olivehurst
Organization State: CA
Organization Zipcode: 95961
Organization Email: jeff.herbert@dot.ca.gov
Organization Phone: (530) 741-4238
General Comments for this Test: JMF 22-001
Test Result Compliance:
Additional Comments When Verified:
Number of tests
|
1
|
What is the unit of measurement for theoretical density?
|
US Units
|
Mass Determination
|
Air
|
Method Performed
|
Mechanical Agitation - Method A
|
Mass of container filled with water
|
1517.7 grams
|
Mass of oven-dry sample in air for Sample 1
|
7345.5 grams
|
Mass of container filled with the sample and water for Sample 1
|
8276.8 grams
|
Temperature of Water
|
77 °F
|
Specific Gravity for Sample 1
|
12.526
|
Theoretical maximum density at 25°C (77°F)
|
no data
|
DIME Test ID: 2022-01-21-47-3
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 03/22/2022
Date Tested: 02/16/2022
Submitted By Organization: CT D03 - Olivehurst Northern Regional Laboratory
Organization Address: 5330 Arboga Road,
Organization City: Olivehurst
Organization State: CA
Organization Zipcode: 95961
Organization Email: jeff.herbert@dot.ca.gov
Organization Phone: (530) 741-4238
General Comments for this Test: JMF 22-001
Test Result Compliance:
Additional Comments When Verified:
Is an aggregate correction factor used?
|
No
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
Cumulative percent passing the 1/2 in. sieve
|
91.9 %
|
Cumulative percent passing the 3/8 in. sieve
|
81.7 %
|
Cumulative percent passing the #4 sieve
|
58.4 %
|
Cumulative percent passing the #8 sieve
|
42.9 %
|
Cumulative percent passing the #16 sieve
|
33.3 %
|
Cumulative percent passing the #30 sieve
|
25.6 %
|
Cumulative percent passing the #50 sieve
|
17.7 %
|
Cumulative percent passing the #100 sieve
|
12.1 %
|
Cumulative percent passing the #200 sieve
|
8.7 %
|