Project Information

Project ID: 214671 DEA: 07303904 EFIS: 0714000044 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-10-31.2/37.2
Work Description: LANE REPLACEMENT
Location Description: LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE EAST OF THE 10/605 SEPARATION TO 0.3 MILE WEST OF CITRUS STREET OVERCROSSING
Contractor Name: Sierra Landscape Development Inc.
Contractor Address: 2209 1/2 Chico Ave., South El Monte CA, 91733
Resident Engineer: Hai Hong Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2022-03-12-1
TL Number from the TL Form:
Sample Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Sample Organization Contact: (213) 817-0387
Type of Sample: Department Acceptance
Type of Material: Concrete
Sample Taken Date: 03/12/2022
Date that the sample was received by the laboratory/organization performing the testing: 03/13/2022
The quantity of what the sample constitutes: 10CY
A brief description of the sample: JPCP-RSC Beams
From where was the sample collected: Manufacturer
Laboratory sample identification: 22-0450
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Security Paving Plant - Baldwin Park

Material Information

The concrete mix design number: G3-21-PRS-237
The truck number from where the sample was collected:
The batch plant ticket number from where the sample was collected: Load 3
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Loader Bucket at Security Paving Plant
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results

Test 1 of 1

DIME Test ID: 2022-03-12-1-1
Test Method: CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength Concrete
Verified Date: 03/22/2022
Date Tested: 03/22/2022
Submitted By Organization: CT D07 - Materials Field Laboratory, Unit 1953
Organization Address: 1940 South Workman Mill Road,
Organization City: Whittier
Organization State: CA
Organization Zipcode: 90601
Organization Email: chad.chotibhongs@dot.ca.gov
Organization Phone: (213) 817-0387
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Number of specimens 3
Does the testing machine measure load or stress on the beam specimen? Load
Fracture initiates in the tension surface Within the Middle Third of the Span Length
Fracture occurred at a capped section No
Is a beam dimensional correction factor used? No
Age of specimen 10 days
Modulus of rupture 790 psi
Modulus of rupture 2 770 psi
Modulus of rupture average 770 psi
Modulus of rupture 3 760 psi