Print Report | Back to Sample Detail

Sample Record for 2022-03-06-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214573 DEA: 073096U4 EFIS: 0719000091 QA Service Level: 1
DIST-CO-RTE-PM: 07-LA-210-R0.0/R9.7
Work Description: PLACE CONCRETE PAVEMENT, BARRIER, HMA, DRAINAGE, AND ELECTRICAL.
Location Description: LOS ANGELES COUNTY IN LOS ANGELES FROM INTERSTATE 5 TO WHEATLAND AVENUE UNDERCROSSING
Contractor Name: FLATIRON WEST INC
Contractor Address: 15335 FAIRFIELD RANCH ROAD, CHINO HILLS, CA 91709
Resident Engineer: Ridwan Salman Structure Rep.: Adriana Pimienta

Sample Information

DIME Sample ID: 2022-03-06-1
TL Number from the TL Form:
Sample Submitted By Organization: Kleinfelder, Incorporated - Los Angeles
Sample Organization Contact: (909) 833-5780
Type of Sample: Quality Assurance
Type of Material: Concrete
Sample Taken Date: 03/06/2022
Date that the sample was received by the laboratory/organization performing the testing: 03/07/2022
The quantity of what the sample constitutes: 660 CY
A brief description of the sample: A set of 3 JPCP RSC beams
From where was the sample collected: Job Site
Laboratory sample identification: 22-0416
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Flatiron Plant - Paxton off-Ramp

Material Information

The concrete mix design number: 3215-JPCPRSC-12
The truck number from where the sample was collected: Load 85
The batch plant ticket number from where the sample was collected: NOT PROVIDED
Concrete batch plant:
The fabricator/manufacturer designation for the sample:
A detailed description of where the material sample was collected: Concrete from wheelbarrow
Where the material sample would have been placed if not sampled:
From Lot No.:
Bag Lot No.:

Test Results