Print Report | Back to Sample Detail

Sample Record for 2022-02-18-8

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215129 DEA: 050N73U4 EFIS: 0520000166 QA Service Level: 1
DIST-CO-RTE-PM: 05-SB-101-7.3/9.6
Work Description: !!Please CC Office Engineer Gabrielle Herrera on reports to RE and SR!! Segment 4C - Summerland: Construct HOV lanes and rehabilitation. Source inspection of sign structure trusses, lighting structures, steel soldier piles, epoxy coated rebar,
Location Description: SUMMERLAND FROM 0.2 MILES NORTH OF PARDARO LANE OVERCROSSING TO SAN YSIDRO CREEK BRIDGE
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: PO Box 6744, Santa Barbara , CA 93111
Resident Engineer: Luobao Cai Structure Rep.: Emiliano Berntsen

Sample Information

DIME Sample ID: 2022-02-18-8
TL Number from the TL Form:
Sample Submitted By Organization: Sequoia Consultants
Sample Organization Contact: (714) 974-6316
Type of Sample: Quality Control
Type of Material: Aggregate
Sample Taken Date: 02/18/2022
Date that the sample was received by the laboratory/organization performing the testing: 02/18/2022
The quantity of what the sample constitutes: 1 per day
A brief description of the sample: 1x4 concrete aggregates
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Martin Marietta Goleta

Material Information

Source Identification (SMARA, name of Pit or Job Site): 91-42-0003
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: belt cut
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: 1 inch
The concrete mix design number: 725A1Z0P
Lot number:
Sublot number:
Aggregate Mix Number:

Test Results