Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 040A5394 Cty SOL Rte 80 PM 11.4/12.8, 2.1/2.8 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Cassaundra Lograsso |
Date Reported: |
02/24/2022 |
|
Address: |
TL Number: |
051716 |
||
City: |
||||
Project Name: Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc. |
||||
Prime Contractor: Kiewit Infrastructure West Co. |
||||
Sample Taken Date: |
01/27/2022 |
Mix Design: |
1619674 |
|
Contractor: Unknown |
Location : I-80/I-680/Route 12 Interchange |
|||
Structure unique identifier: 23-0258G |
||||
Structure name: |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 4.02 | 12.69 | 78900 | 6216.0 | 1 |
2 | 4.03 | 12.76 | 80242 | 6291.0 | 1 |
3 | 4.04 | 12.82 | 76881 | 5997 | 1 |
DIME Test ID: 2022-01-27-17-1
Number of specimens: 3
Compressive strength (to nearest 10 psi): 6170
Age of specimen: 28 days
Certified By: Spencer Adams
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing