Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 030F2204 Cty ED Rte 50 PM R30.7/R31.7 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Jarrett Woodruff |
Date Reported: |
10/29/2014 |
|
Address: |
TL Number: |
|
||
City: |
||||
Project Name: REPLACE BRIDGE. |
||||
Prime Contractor: VIKING CONSTRUCTION COMPANY, INC. |
||||
Sample Taken Date: |
10/01/2014 |
Mix Design: |
na |
|
Contractor: Unknown |
Location : SLY PARK UNDERCROSSING |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 28.18 | 5.99 | 5788.6 | 163122 | 1 |
2 | 28.09 | 5.98 | 5943.0 | 166939 | 1 |
DIME Test ID: 2014-10-01-12-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 5870
Comment on any defect in either specimen or caps (Max 250 Characters):
Age of specimen: 28 days
Certified By: Bang Nguyen
Test ID: 2014-10-01-12-1: for information only.
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing