Print Report | Back to Sample Detail

Sample Record for 2022-01-24-23

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214921 DEA: 09367404 EFIS: 0916000025 QA Service Level: 1
DIST-CO-RTE-PM: 09-KER-14-R4.7/R12.6
Work Description: CONSTRUCT CRCP OVER EXISTING PAVEMENT AND PLACE HMA.
Location Description: KERN COUNTY AT AND NEAR ROSAMOND AND MOJAVE FROM 1.4 MILES SOUTH OF DAWN ROAD OVERCROSSING TO 0.5 MILE NORTH OF SILVER QUEEN ROAD OVERCROSSING
Contractor Name: Jesus Pena
Contractor Address: 18201 Von Karman, Suite #800, IRVINE CA 92612
Resident Engineer: Hin Hartanto Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2022-01-24-23
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Per Request
Type of Material: Asphalt Binder
Sample Taken Date: 01/24/2022
Date that the sample was received by the laboratory/organization performing the testing: 01/26/2022
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification: 0112-22
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Granite-Big Rock

Material Information

Performance Grade: PG 58-34 M
Modified:
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Valero Marketing & Supply - Benicia CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:

Test Results

Test 1 of 9

DIME Test ID: 2022-01-24-23-1
Test Method: AASHTO T228-09r13: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 02/01/2022
Date Tested: 01/28/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Specific Gravity 1.008

Test 2 of 9

DIME Test ID: 2022-01-24-23-2
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 02/01/2022
Date Tested: 01/28/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers? Two
Any material loss from containers during heating process/testing? Yes
Mass of empty container #1 172.718 grams
Mass of empty container #2 168.851 grams
Mass of container #1 before test (m1i) 207.604 grams
Mass of container #2 before test (m2i) 203.964 grams
Mass of container #1 after test (m1f) 207.455 grams
Mass of container #2 after test (m2f) 203.800 grams
Average mass change -0.447 percent

Test 3 of 9

DIME Test ID: 2022-01-24-23-3
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 02/01/2022
Date Tested: 01/28/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase Original binder
Phase Angle (δ) (for the 10 cycles) 61.0 degree
Dynamic Shear, G*/sin(δ) 4.47 kPa
(G*) x sin(δ)= no data

Test 4 of 9

DIME Test ID: 2022-01-24-23-4
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 02/01/2022
Date Tested: 01/28/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase RTFO residue
Phase Angle (δ) (for the 10 cycles) 55.0 degree
Dynamic Shear, G*/sin(δ) 11.60 kPa
(G*) x sin(δ)= no data

Test 5 of 9

DIME Test ID: 2022-01-24-23-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 02/01/2022
Date Tested: 01/28/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s? Pa-s
Time of test 7:00 HH:MM
Test Temperature 135 C
Speed 50 rpm
Spindle size 21 in
Torque 96 %
Viscosity reading #1 (A) 0.964 Pa-s
Viscosity reading #2 (B) 0.959 Pa-s
Viscosity reading #3 (C) 0.959 Pa-s
Average viscosity 0.961 Pa-s

Test 6 of 9

DIME Test ID: 2022-01-24-23-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 02/01/2022
Date Tested: 01/28/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation? NA
Soluble, percent 99.8 %
Insoluble, percent 0.2 %

Test 7 of 9

DIME Test ID: 2022-01-24-23-7
Test Method: AASHTO T301-13: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Verified Date: 02/18/2022
Date Tested: 02/08/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
% Elongation Recovery 75 %

Test 8 of 9

DIME Test ID: 2022-01-24-23-8
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 02/18/2022
Date Tested: 02/15/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase PAV residue
Test Plate Diameter 8 mm
Phase Angle (δ) (for the 10 cycles) 42.1 degree
(G*) x sin(δ)= 2470 kPa

Test 9 of 9

DIME Test ID: 2022-01-24-23-9
Test Method: AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 02/18/2022
Date Tested: 02/15/2022
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Time test started no data HH:MM:SS
Flags issued by software during test no data
Correlation coefficient (R²) 0
Regression coefficient a no data
Regression coefficient b no data
Regression coefficient c no data
Load at time 0.0 0.0 mN
Deflection at time 0.0 s 0.000 µm
Load at time 0.5 s 0.0 mN
Deflection at time 0.5 s 0.000 µm
Load at 60.0 s 0.0 mN
Beam deflection 60.0 s 0.000 µm
Measured Stiffness Modulus 60.0 s 170.000 mPa
Estimated Stiffness Modulus 60.0 s no data
Difference between stiffness moduli 60.0 s no data
Estimated m-value 60.0 s 0.285