Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 04297634 Cty ALA Rte 84 PM 17.9/21 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Paramjit Pandher |
Date Reported: |
12/28/2021 |
|
Address: |
TL Number: |
169805 |
||
City: |
||||
Project Name: ROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION. |
||||
Prime Contractor: Bay Cities Paving & Grading |
||||
Sample Taken Date: |
11/30/2021 |
Mix Design: |
D10115EA |
|
Contractor: Unknown |
Location : ALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84 |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 4.02 | 12.69 | 61649 | 4857.0 | 1 |
2 | 4.01 | 12.63 | 58724 | 4650.0 | 1 |
3 | 4.02 | 12.69 | 63383 | 4994 | 1 |
DIME Test ID: 2021-11-30-44-1
Number of specimens: 3
Compressive strength (to nearest 10 psi): 4830
Age of specimen: 28 days
Certified By: Spencer Adams
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing