Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 030F2204 Cty ED Rte 50 PM R30.7/R31.7 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Jarrett Woodruff |
Date Reported: |
10/20/2014 |
|
Address: |
TL Number: |
|
||
City: |
||||
Project Name: REPLACE BRIDGE. |
||||
Prime Contractor: VIKING CONSTRUCTION COMPANY, INC. |
||||
Sample Taken Date: |
09/22/2014 |
Mix Design: |
SF718AFST0 |
|
Contractor: Unknown |
Location : SLY PARK UNDERCROSSING |
|||
Structure unique identifier: Unknown |
||||
Structure name: Unknown |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-10 : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Cross sectional area of cylinder (in^2) | Average diameter of cylinder (in) | Compressive strength of cylinder (psi) | Maximum load on cylinder (lb) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 28.09 | 5.98 | 4964.9 | 139465 | 1 |
2 | 28.09 | 5.98 | 5001.1 | 140482 | 1 |
DIME Test ID: 2014-09-22-4-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4980
Comment on any defect in either specimen or caps (Max 250 Characters):
Age of specimen: 28 days
Certified By: Steve Wake
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing