Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369
QA Service Level: 1
DIST-CO-RTE-PM: 08-RIV-I-15,SR-91-6.1-7.6
Work Description: I-15 ELC: 15/91 Express Lanes Connector Project (ELC)
Location Description: Junction of I-15 and SR-91 in Corona, CA
Contractor Name: Myers-Rados Joint Venture
Contractor Address: 629 N. Main Street, Suite C3, Corona, CA 92878
Resident Engineer: Roy Fisher Structure Rep.: Alhakem Alina
DIME Sample ID: 2021-10-15-25
TL Number from the TL Form:
Sample Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Per Request
Type of Material: Asphalt Binder
Sample Taken Date: 10/15/2021
Date that the sample was received by the laboratory/organization performing the testing: 10/22/2021
The quantity of what the sample constitutes: 1 Quart Can
A brief description of the sample: PG Asphalt Binder
From where was the sample collected: Supplier
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: R J Noble - Corona
Performance Grade: PG 64-10
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier: Lunday Thagard Company-World Oil - South Gate CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2021-10-15-25-1
Test Method: AASHTO T228-09r13: Standard Method of Test for Specific Gravity of Semi-Solid Asphalt Materials (Specific Gravity)
Verified Date: 10/26/2021
Date Tested: 10/25/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
DIME Test ID: 2021-10-15-25-2
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 10/26/2021
Date Tested: 10/25/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
RTFO residue
|
Phase Angle (δ) (for the 10 cycles)
|
85.1 degree
|
Dynamic Shear, G*/sin(δ)
|
3.00 kPa
|
(G*) x sin(δ)=
|
no data
|
DIME Test ID: 2021-10-15-25-3
Test Method: AASHTO T315-12: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 10/26/2021
Date Tested: 10/25/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
Original binder
|
Phase Angle (δ) (for the 10 cycles)
|
87.7 degree
|
Dynamic Shear, G*/sin(δ)
|
1.32 kPa
|
(G*) x sin(δ)=
|
no data
|
DIME Test ID: 2021-10-15-25-5
Test Method: AASHTO T316-17: Standard Method of Test for Viscosity Determination of Asphalt Binder Using Rotational Viscometer
Verified Date: 10/26/2021
Date Tested: 10/25/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is viscosity reading in cP/Pa-s?
|
Pa-s
|
Time of test
|
7:13 HH:MM
|
Test Temperature
|
135 C
|
Speed
|
100 rpm
|
Spindle size
|
21 in
|
Torque
|
72 %
|
Viscosity reading #1 (A)
|
0.365 Pa-s
|
Viscosity reading #2 (B)
|
0.365 Pa-s
|
Viscosity reading #3 (C)
|
0.364 Pa-s
|
Average viscosity
|
0.365 Pa-s
|
DIME Test ID: 2021-10-15-25-6
Test Method: AASHTO T44-18: Standard Method of Test for Solubility of Bituminous Materials
Verified Date: 10/26/2021
Date Tested: 10/25/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Was test performed on residue from distillation or evaporation?
|
NA
|
Soluble, percent
|
99.7 %
|
Insoluble, percent
|
0.3 %
|
DIME Test ID: 2021-10-15-25-8
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 10/26/2021
Date Tested: 10/25/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers?
|
Two
|
Any material loss from containers during heating process/testing?
|
Yes
|
Mass of empty container #1
|
170.101 grams
|
Mass of empty container #2
|
166.436 grams
|
Mass of container #1 before test (m1i)
|
205.233 grams
|
Mass of container #2 before test (m2i)
|
201.333 grams
|
Mass of container #1 after test (m1f)
|
204.987 grams
|
Mass of container #2 after test (m2f)
|
201.077 grams
|
Average mass change
|
-0.717 percent
|
DIME Test ID: 2021-10-15-25-9
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 11/23/2021
Date Tested: 11/22/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
PAV residue
|
Test Plate Diameter
|
8 mm
|
Phase Angle (δ) (for the 10 cycles)
|
53.8 degree
|
(G*) x sin(δ)=
|
1190 kPa
|
DIME Test ID: 2021-10-15-25-10
Test Method: AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 11/23/2021
Date Tested: 11/22/2021
Submitted By Organization: CT D08 - Fontana Southern Regional Laboratory
Organization Address: 13970 Victoria Street,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: (909) 829-3029
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Time test started
|
no data HH:MM:SS
|
Flags issued by software during test
|
no data
|
Correlation coefficient (R²)
|
0
|
Regression coefficient a
|
no data
|
Regression coefficient b
|
no data
|
Regression coefficient c
|
no data
|
Load at time 0.0
|
0.0 mN
|
Deflection at time 0.0 s
|
0.000 µm
|
Load at time 0.5 s
|
0.0 mN
|
Deflection at time 0.5 s
|
0.000 µm
|
Load at 60.0 s
|
0.0 mN
|
Beam deflection 60.0 s
|
0.000 µm
|
Measured Stiffness Modulus 60.0 s
|
44.700 mPa
|
Estimated Stiffness Modulus 60.0 s
|
no data
|
Difference between stiffness moduli 60.0 s
|
no data
|
Estimated m-value 60.0 s
|
0.390
|