Print Report | Back to Sample Detail

Sample Record for 2021-08-31-15

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 215494 DEA: 081H4904 EFIS: 0817000059 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-18-31.9/38.5
Work Description: COLD PLANE AC PAVEMENT AND OVERLAY WITH HMA (TYPE A).
Location Description: SAN BERNARDINO COUNTY FROM 0.1 MILE EAST OF HILLTOP CONNECTOR TO 0.5 MILE EAST OF SIBERIA CREEK TRAIL
Contractor Name: Matich Corp
Contractor Address: P.O. Box 10, Highland, CA 92346-1010
Resident Engineer: Nhan Nguyen Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2021-08-31-15
TL Number from the TL Form:
Sample Submitted By Organization: CT - Southern Regional Laboratory
Sample Organization Contact: 213-792-4794
Type of Sample: Acceptance
Type of Material: Hot Mix Asphalt
Sample Taken Date: 08/31/2021
Date that the sample was received by the laboratory/organization performing the testing: 09/01/2021
The quantity of what the sample constitutes: 2 boxes 672.54 tons out
A brief description of the sample: 3/4" HMA-A SP R12 0.75% LAS
From where was the sample collected: Manufacturer
Laboratory sample identification: 0515A-21
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Matich Lytle Creek

Material Information

HMA Type: Type A HMA
HMA Grading: 3/4 inch
Lot number:
Sublot number:

Test Results

Test 1 of 1

DIME Test ID: 2021-08-31-15-2
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Verified Date: 09/09/2021
Date Tested: 09/02/2021
Submitted By Organization: CT - Southern Regional Laboratory
Organization Address: 13970 Victoria St,
Organization City: Fontana
Organization State: CA
Organization Zipcode: 92336
Organization Email: jose.guzman@dot.ca.gov
Organization Phone: 213-792-4794
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Asphalt Binder Content 4.68 %
Correction Factor (Percent by mass of HMA Specimen) no data

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
2021-08-31-15-1AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)09/01/2021Not scheduledCristina ParedesCT - Southern Regional Laboratory