Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 215554 DEA: 061A9004 EFIS: 0621000018
QA Service Level: 1
DIST-CO-RTE-PM: 06-KER-5-4.4/R15.8
Work Description: COLD PLANE & PLACE HMA & INDIVIDUAL SLAB REPLACEMENT.
Location Description: KERN COUNTY AT GRAPEVINE FROM 0.4 MILE NORTH OF LEBEC ROAD OVERCROSSING TO ROUTES 5/99 SEPARATION
Contractor Name: RV Concrete
Contractor Address: 605 E. Commercial St., Anaheim, CA 92801
Resident Engineer: Isidro Perez Structure Rep.: Unknown
DIME Sample ID: 2021-08-25-24
TL Number from the TL Form: 772219
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Department Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 08/25/2021
Date that the sample was received by the laboratory/organization performing the testing: 08/31/2021
The quantity of what the sample constitutes: 1 can
A brief description of the sample: Asphalt Binder PG 70-10
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: San Joaquin Refinery, Bakersfield, CA
Performance Grade: PG 70-10
Modified: No
Lot number: 1
Sublot number: 4
Tank number: 32001
Time of sample:
HMA Supplier: Vulcan Materials
Certified Asphalt Supplier: San Joaquin Refinery - Bakersfield CA
Multigrade: No
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2021-08-25-24-1
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 09/14/2021
Date Tested: 09/14/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 Standard Specifications
Test Result Compliance: complies
Additional Comments When Verified:
Is mass change based on one or two containers?
|
Two
|
Any material loss from containers during heating process/testing?
|
No
|
Mass of empty container #1
|
173.721 grams
|
Mass of empty container #2
|
179.436 grams
|
Mass of container #1 before test (m1i)
|
209.164 grams
|
Mass of container #2 before test (m2i)
|
215.309 grams
|
Mass of container #1 after test (m1f)
|
209.154 grams
|
Mass of container #2 after test (m2f)
|
215.306 grams
|
Average mass change
|
-0.018 percent
|
DIME Test ID: 2021-08-25-24-2
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/14/2021
Date Tested: 09/07/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 Standard Specifications Original
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
Original binder
|
Test Plate Diameter
|
25 mm
|
Test Gap
|
1 mm
|
Test Frequency
|
10.0 rad/s
|
Strain Amplitude
|
12.00 %
|
Stress Amplitude
|
0.154 kPa
|
Phase Angle (δ) (for the 10 cycles)
|
89.5 degree
|
Complex Modulus (G*) (for the 10 measurements)
|
1.279 kPa
|
Test Temperature (Specimen 1)
|
70.0 C
|
Dynamic Shear, G*/sin(δ)
|
1.28 kPa
|
DIME Test ID: 2021-08-25-24-3
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/14/2021
Date Tested: 09/08/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 Standard Specifications RTFO
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
RTFO residue
|
Test Plate Diameter
|
25 mm
|
Test Gap
|
1 mm
|
Test Frequency
|
10.0 rad/s
|
Strain Amplitude
|
10.00 %
|
Stress Amplitude
|
0.236 kPa
|
Phase Angle (δ) (for the 10 cycles)
|
88.8 degree
|
Complex Modulus (G*) (for the 10 measurements)
|
2.364 kPa
|
Test Temperature (Specimen 1)
|
70.0 C
|
Dynamic Shear, G*/sin(δ)
|
2.36 kPa
|
DIME Test ID: 2021-08-25-24-4
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/14/2021
Date Tested: 09/09/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 Standard Specifications PAV
Test Result Compliance: not applicable
Additional Comments When Verified:
Phase
|
PAV residue
|
Test Plate Diameter
|
8 mm
|
Test Gap
|
2 mm
|
Test Frequency
|
10.0 rad/s
|
Strain Amplitude
|
1.00 %
|
Stress Amplitude
|
86.854 kPa
|
Phase Angle (δ) (for the 10 cycles)
|
57.8 degree
|
Complex Modulus (G*) (for the 10 measurements)
|
8685.462 kPa
|
Test Temperature (Specimen 1)
|
34.0 C
|
(G*) x sin(δ)=
|
7350 kPa
|
DIME Test ID: 2021-08-25-24-5
Test Method: AASHTO T313-19: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Verified Date: 09/14/2021
Date Tested: 09/13/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 standard specification
Test Result Compliance: complies
Additional Comments When Verified:
Minimum test bath temperature at 240 s
|
0.0 C
|
Maximum test bath temperature at 240 s
|
0.0 C
|
Time of test load application
|
no data HH:MM:SS
|
File name of test data
|
no data
|
Time beam in bath
|
no data
|
Time test started
|
no data HH:MM:SS
|
Flags issued by software during test
|
no data
|
Correlation coefficient (R²)
|
0
|
Regression coefficient a
|
no data
|
Regression coefficient b
|
no data
|
Regression coefficient c
|
no data
|
Load at time 0.0
|
0.0 mN
|
Deflection at time 0.0 s
|
0.000 µm
|
Load at time 0.5 s
|
0.0 mN
|
Deflection at time 0.5 s
|
0.000 µm
|
Load at 60.0 s
|
996.0 mN
|
Beam deflection 60.0 s
|
0.310 µm
|
Measured Stiffness Modulus 60.0 s
|
259.000 mPa
|
Estimated Stiffness Modulus 60.0 s
|
259.000 mPa
|
Difference between stiffness moduli 60.0 s
|
no data
|
Estimated m-value 60.0 s
|
0.372
|
DIME Test ID: 2021-08-25-24-6
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/14/2021
Date Tested: 09/09/2021
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Per 2018 Standard Specifications PAV+3
Test Result Compliance: complies
Additional Comments When Verified:
Phase
|
PAV residue
|
Test Plate Diameter
|
8 mm
|
Test Gap
|
2 mm
|
Test Frequency
|
10.0 rad/s
|
Strain Amplitude
|
1.00 %
|
Stress Amplitude
|
51.455 kPa
|
Phase Angle (δ) (for the 10 cycles)
|
61.7 degree
|
Complex Modulus (G*) (for the 10 measurements)
|
5145.477 kPa
|
Test Temperature (Specimen 1)
|
37.0 C
|
(G*) x sin(δ)=
|
4530 kPa
|