Sample Record for 2021-06-18-18
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 214893 DEA: 010A1204 EFIS: 0113000109
QA Service Level: 1
DIST-CO-RTE-PM: 01-HUM-96,101-VAR
Work Description: PARTIAL BRIDGE REMOVAL, SEISMIC RETROFIT AND RECONSTRUCT GUARDRAIL.
Location Description: HUMBOLDT COUNTY AT VARIOUS LOCATIONS
Contractor Name: Steelhead Constructors JV
Contractor Address: P.O. Box 536, Palo Cedro, CA 96073
Resident Engineer: Brian Winter Structure Rep.: Laura Cangas
Sample Information
DIME Sample ID: 2021-06-18-18
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 06/18/2021
Date that the sample was received by the laboratory/organization performing the testing: 07/07/2021
The quantity of what the sample constitutes: 4
A brief description of the sample: Bar Lock Coupler
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Rebar
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC Rebar
Coupler Manufacturer: 182833
Intermediate Assembler or Fabricator:
Rebar Size: #8
Coupler Model: D250L Bar Lock
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 182833
Rebar Heat Number(s): 6019801
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 3
DIME Test ID: 2021-06-18-18-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/08/2021
Date Tested: 07/07/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 8/25mm | 1 | -0.0009 | 0.79 | 79649 | 100822 | Service Splice | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
Small
|
Test 2 of 3
DIME Test ID: 2021-06-18-18-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/08/2021
Date Tested: 07/07/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 8/25mm | 1 | 0 | 0.79 | 79619 | 100784 | Service Splice | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 3
DIME Test ID: 2021-06-18-18-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 07/08/2021
Date Tested: 07/07/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 8/25mm | 1 | 0 | 0.79 | 79615 | 100778 | Service Splice | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72.00 f
|
Halo ID
|
|