Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 215424 DEA: 024G4404 EFIS: 0214000013
QA Service Level: 1
DIST-CO-RTE-PM: 02-SIS-3-38.0/38.6
Work Description: BRIDGE REPLACEMENT
Location Description: SISKIYOU COUNTY ABOUT 6 MILES NORTH OF FORT JONES FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF LOWER MOFFETT CREEK ROAD
Contractor Name: Steelhead Constructors
Contractor Address: 2940 INNSBRUCK DRIVE, REDDING CA 96003
Resident Engineer: Nicole Mallory Structure Rep.: Andy O'Sullivan
DIME Sample ID: 2021-07-01-14
TL Number from the TL Form: C926651
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM7 - Epoxy Coated Rebar
Sample Taken Date: 07/01/2021
Date that the sample was received by the laboratory/organization performing the testing: 07/06/2021
The quantity of what the sample constitutes: 2
A brief description of the sample: Green Epoxy Rebar
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Nucor Erico Lention
Rebar Heat Number(s): 3600019380
Rebar Epoxy Batch Number(s): 3CH2101005
Rebar Coating Specification: ASTM A775
Rebar Size (#): 5
Rebar Coating Color: Green
Rebar Manufacturer: Nucor
Rebar Coater: FCS Construction
Rebar Powder Manufacturer: 3M
Release Number:
Quality Assurance Code:
DIME Test ID: 2021-07-01-14-1
Test Method: ASTM A775-07b-re14: Standard Specification for Epoxy-Coated Steel Reinforcing Bars (Holiday)
Verified Date: 07/07/2021
Date Tested: 07/06/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Total Number of Holiday
|
no data0
|
Total Length
|
5
|
Holidays Per Linear Foot of Bar
|
no data0 holiday per ft
|
Holiday Test Pass/Fail
|
Pass
|
Bend Test Pass/Fail
|
Pass
|
DIME Test ID: 2021-07-01-14-2
Test Method: ASTM A775-07b-re14: Standard Specification for Epoxy-Coated Steel Reinforcing Bars (Epoxy Coating)
Verified Date: 07/07/2021
Date Tested: 07/06/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
First Bar Mean
|
9.25
|
Second Bar Mean
|
10.55
|
Lower spec. limit LSL
|
7
|
Upper spec. limit USL
|
12
|
Bar # for First Bar
|
1
|
Bar # for Second Bar
|
2
|
Total mean value
|
9.89
|
Total number of values less than LSL
|
no data
|
Total number of values greater than USL
|
no data
|