Sample Record for 2021-06-17-25
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 214355 DEA: 120K0214 EFIS: 1214000096
QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-5-12.4/14.5
Work Description: South County Improvement Project (Phase 1 - Avery/Crown Valley) PLACE HMA, INSTALL CONC PAVEMENT, RETAIN WALL, MODIFY ELECT SYS. | Add one lane btwn 73 & Oso PKWY
Location Description: ORANGE COUNTY IN SAN JUAN CAPISTRANO, LAGUNA HILLS, LAGUNA NIGUEL AND MISSION VIEJO FROM 0.5 MILE SOUTH OF AVERY PARKWAY UNDERCROSSING TO 0.8 MILE NORTH OF CROWN VALLEY PARKWAY OVERCROSSING
Contractor Name: ORTIZ ENTERPRISES, INC.
Contractor Address: 6 Cushing, Suite 200, Irvine, CA 92618
Resident Engineer: Kifah Ramadan Structure Rep.: Imad Karam
Sample Information
DIME Sample ID: 2021-06-17-25
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (916) 227-7253
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 06/17/2021
Date that the sample was received by the laboratory/organization performing the testing: 06/22/2021
The quantity of what the sample constitutes: 4
A brief description of the sample: Dayton Bar lock couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Dayton Integrity
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Integrity Rebar
Coupler Manufacturer: Dayton Superior
Intermediate Assembler or Fabricator:
Rebar Size: #11
Coupler Model: Bar Lock Standard Couplers
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): MM20105026
Rebar Heat Number(s): 3101750
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 3
DIME Test ID: 2021-06-17-25-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/23/2021
Date Tested: 06/23/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 11/36mm | 1 | 0 | 1.56 | 133362 | 85488 | service splice | spaine |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
Small
|
Test 2 of 3
DIME Test ID: 2021-06-17-25-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/23/2021
Date Tested: 06/23/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 11/36mm | 1 | 0 | 1.56 | 136587 | 87556 | service splice | spaine |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 3
DIME Test ID: 2021-06-17-25-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/23/2021
Date Tested: 06/23/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: service splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 11/36mm | 1 | 0 | 1.56 | 143891 | 92238 | service splice | spaine |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|