Sample Record for 2021-06-17-22
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 213469 DEA: 024C40V4 EFIS: 0218000125
QA Service Level: 1
DIST-CO-RTE-PM: 02-SHA-5-R3.8/R11.7
Work Description: WIDEN TO 6 LANES, BRIDGE REPLACEMENT AND WIDENING AND ROADWAY REHAB
Location Description: SHASTA COUNTY IN AND NEAR ANDERSON FROM ROUTE 5/273 SEPARATION TO 0.4 MILE SOUTH OF CHURN CREEK ROAD OVERCROSSING
Contractor Name: J.F. SHEA CONSTRUCTION
Contractor Address: P.O. BOX 494519, REDDING, CA 96049-4519
Resident Engineer: Henry Benner Structure Rep.: Eric Chaffee
Sample Information
DIME Sample ID: 2021-06-17-22
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 06/17/2021
Date that the sample was received by the laboratory/organization performing the testing: 06/22/2021
The quantity of what the sample constitutes: 300
A brief description of the sample: Couplers
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HRC CMC
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator:
Rebar Size: #10
Coupler Model: HRC 500/510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 75070365, 75069594, 73118000
Rebar Heat Number(s): 4108368
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 6
DIME Test ID: 2021-06-17-22-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/22/2021
Date Tested: 06/22/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 10/32mm | 1 | -0.0019 | 1.27 | 119726 | 94272 | Ok necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
Small
|
Test 2 of 6
DIME Test ID: 2021-06-17-22-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/22/2021
Date Tested: 06/22/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 10/32mm | 1 | 0 | 1.27 | 119812 | 94340 | Ok necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 6
DIME Test ID: 2021-06-17-22-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/22/2021
Date Tested: 06/22/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 10/32mm | 1 | 0 | 1.27 | 120001 | 94489 | Ok necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 4 of 6
DIME Test ID: 2021-06-17-22-9
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/22/2021
Date Tested: 06/22/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 10/32mm | 2 | -0.0012 | 1.27 | 119819 | 94345 | Ok necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
Small
|
Test 5 of 6
DIME Test ID: 2021-06-17-22-10
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/22/2021
Date Tested: 06/22/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 10/32mm | 2 | 0 | 1.27 | 119662 | 94222 | Ok necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 6 of 6
DIME Test ID: 2021-06-17-22-11
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 06/22/2021
Date Tested: 06/22/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 10/32mm | 2 | 0 | 1.27 | 119717 | 94265 | Ok necking | bewing |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|