Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 04160304 Cty ALA Rte 84 PM 13.1/13.5 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Yannaing Tun (Abeer Dahhan) |
Date Reported: |
06/23/2021 |
|
Address: |
TL Number: |
197222 |
||
City: |
||||
Project Name: NILES CANYON ALAMEDA CREEK BRIDGE REPLACEMENT |
||||
Prime Contractor: VIKING CONSTRUCTION COMPANY, INC. |
||||
Sample Taken Date: |
05/12/2021 |
Mix Design: |
DDGPV2Q3 |
|
Contractor: Unknown |
Location: IN FREMONT, AT ALAMEDA CREEK BRIDGE (BR 33-0036). |
|||
Structure unique identifier: |
||||
Structure name: Niles Canyon |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.01 | 28.37 | 202696 | 7145.0 | 1 |
2 | 6.01 | 28.37 | 216297 | 7624.0 | 4 |
DIME Test ID: 2021-05-12-50-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 7380
Age of specimen: 42 days
Certified By: Spencer Adams
*Subject to final inspection by the Resident Engineer. |
![]() |
TL- Report of Laboratory Testing