Print Report | Back to Sample Detail

Sample Record for 2021-04-12-12

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 213653 DEA: 044G8204 EFIS: 0413000049 QA Service Level: 1
DIST-CO-RTE-PM: 04-MRN-101-10.6/10.8
Work Description: REPLACE SAN RAFAEL HARBOR BRIDGE (ABC)
Location Description: MARIN COUTY, IN SAN RAFAEL, FROM ROUTE 101 NORTHBOUND OFF-RAMP TO 2ND STREET
Contractor Name: Gordon N. Ball
Contractor Address: 333 Camille Ave., Alamo, CA 94507
Resident Engineer: Dawit Habteselassie Structure Rep.: Long N Ly

Sample Information

DIME Sample ID: 2021-04-12-12
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Control
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 04/12/2021
Date that the sample was received by the laboratory/organization performing the testing:
The quantity of what the sample constitutes: 795
A brief description of the sample: Ultimate Welded Rebar Hoop
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 091221
Hoop Manufacturer Lot Number(s): 10 to 15
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #6
Diameter of Hoop: 1'-4"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Cascade
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results