Print Report | Back to Sample Detail

Sample Record for 2021-03-12-15

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214900 DEA: 034F8104 EFIS: 0314000291 QA Service Level: 1
DIST-CO-RTE-PM: 03-GLE-32-L0.0/R0.3,0.1/0.9
Work Description: CONSTRUCT SIDEWALKS, CURB RAMPS, & DRIVEWAYS.
Location Description: GLENN COUNTY IN ORLAND AT VARIOUS LOCATIONS FROM ROUTE 5 SOUTHBOUND OFF RAMP TO ROUTE 32 TO NINTH STREET/TEHAMA STREET AND FROM FOURTH STREET TO WOODWARD AVENUE
Contractor Name: T AND S DVBE, INC.
Contractor Address: 4965 S. Barney Street, Anderson, CA 96007
Resident Engineer: Ryan Johnson Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2021-03-12-15
TL Number from the TL Form: C778174
Sample Submitted By Organization: CT D03 - North Region Materials Lab
Sample Organization Contact: (530) 741-4238
Type of Sample: Verification
Type of Material: Asphalt Binder
Sample Taken Date: 03/12/2021
Date that the sample was received by the laboratory/organization performing the testing: 03/12/2021
The quantity of what the sample constitutes: JMF Verification
A brief description of the sample: PG 64-16
From where was the sample collected: Manufacturer
Laboratory sample identification: JMF21-003
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Knife River Construction - Orland Drum Plant

Material Information

Performance Grade: PG 64-16
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Asphalt Binder Supplier: Valero Marketing & Supply - Benicia CA
Multigrade:
Multigrade Type:

Test Results

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
No tests have been assigned to this sample.