Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 66667 DEA: JMFPP EFIS: 0019000043
QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown
DIME Sample ID: 2021-03-17-27
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Verification
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 03/17/2021
Date that the sample was received by the laboratory/organization performing the testing: 03/17/2021
The quantity of what the sample constitutes: 2 bags
A brief description of the sample: RAP
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Syar Industries Inc
DIME Test ID: 2021-03-17-27-1
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 04/07/2021
Date Tested: 03/29/2021
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test:
Test Result Compliance: not applicable
Additional Comments When Verified:
Is an aggregate correction factor used?
|
No
|
Cumulative percent passing the 2 in. sieve
|
100 %
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
Cumulative percent passing the 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 3/8 in. sieve
|
99.4 %
|
Cumulative percent passing the #4 sieve
|
74.5 %
|
Cumulative percent passing the #8 sieve
|
50.8 %
|
Cumulative percent passing the #16 sieve
|
36 %
|
Cumulative percent passing the #30 sieve
|
27.4 %
|
Cumulative percent passing the #50 sieve
|
20 %
|
Cumulative percent passing the #100 sieve
|
12.3 %
|
Cumulative percent passing the #200 sieve
|
8.5 %
|
DIME Test ID: 2021-03-17-27-2
Test Method: AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 04/07/2021
Date Tested: 03/29/2021
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Number of tests
|
2
|
What is the unit of measurement for theoretical density?
|
US Units
|
Mass Determination
|
Air
|
Method Performed
|
Mechanical Agitation - Method A
|
Mass of container filled with water
|
7356.6 grams
|
Mass of oven-dry sample in air for Sample 1
|
1464.4 grams
|
Mass of container filled with the sample and water for Sample 1
|
8247.1 grams
|
Mass of container filled with water
|
7356.6
|
Mass of oven-dry sample in air for Sample 2
|
1561.7 grams
|
Mass of container filled with the sample and water for Sample 2
|
8305.9 grams
|
Temperature of Water
|
70 °F
|
Specific Gravity for Sample 1
|
2.552
|
Specific Gravity for Sample 2
|
2.550
|
Average Specific Gravity
|
2.551
|
Theoretical maximum density at 25°C (77°F)
|
no data
|