Print Report | Back to Sample Detail

Sample Record for 2021-03-19-9

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214227 DEA: 100Q1214 EFIS: 1014000167 QA Service Level: 1
DIST-CO-RTE-PM: 10-MER-99-28.2/R37.3
Work Description: PLACE REINFORCED CONCRETE PAVEMENT, HMA & FIBER OPTIC CABLE SYSTEM.
Location Description: MERCED COUNTY IN AND NEAR LIVINGSTON FROM 0.8 MILE SOUTH OF HAMMATT AVENUE OVERCROSSING TO STANISLAUS COUNTY LINE
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3075 Townsgate Road, Suite 200, Westlake Village, CA 91361
Resident Engineer: Nathaniel Tumminello Structure Rep.: Karen Sampson

Sample Information

DIME Sample ID: 2021-03-19-9
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 03/19/2021
Date that the sample was received by the laboratory/organization performing the testing: 03/26/2021
The quantity of what the sample constitutes: 4
A brief description of the sample: HRC 500 510 Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HRC CMC Rebar

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC Rebar
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator:
Rebar Size: #9
Coupler Model: HRC 500-510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 351818 351817
Rebar Heat Number(s): 3095934
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 3

DIME Test ID: 2021-03-19-9-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 03/30/2021
Date Tested: 03/29/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 9/29mm1-0.005819875998759OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID Small

Test 2 of 3

DIME Test ID: 2021-03-19-9-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 03/30/2021
Date Tested: 03/29/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 9/29mm1019825398253OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID

Test 3 of 3

DIME Test ID: 2021-03-19-9-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 03/30/2021
Date Tested: 03/29/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 9/29mm1019955199551OK Neckingfsaylor
UTM 400kip
Temperature 72.00 f
Halo ID