Print Report | Back to Sample Detail

Sample Record for 2021-03-17-5

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 88888 DEA: SMTL-STOCK EFIS: SMTL-STOCK QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for SMTL stock material. Object Code: 1025. J2 DEA: 912680.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2021-03-17-5
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Authorization
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 03/17/2021
Date that the sample was received by the laboratory/organization performing the testing: 03/17/2021
The quantity of what the sample constitutes: 4
A brief description of the sample: HRC 626 Lap Splice
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: HRC

Material Information

Production or Authorization Testing: Authorization Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: CMC
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator:
Rebar Size: #6
Coupler Model: HRC 626
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): 64059574
Rebar Heat Number(s): 3097832
Rebar Size 2 : 4
Coupler Unique ID:

Test Results

Test 1 of 4

DIME Test ID: 2021-03-17-5-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 04/27/2021
Date Tested: 04/20/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
1No. 6/19mm10.444300097728Service Splicefsaylor
UTM 400kip
Temperature 72.00 f

Test 2 of 4

DIME Test ID: 2021-03-17-5-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 04/27/2021
Date Tested: 04/20/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice ; Bar Pull out of Coupler
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
2No. 6/19mm10.442457555852Service Splice fsaylor
UTM 400kip
Temperature 72.00 f

Test 3 of 4

DIME Test ID: 2021-03-17-5-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 04/27/2021
Date Tested: 04/20/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
3No. 6/19mm10.444285197388Service Splicefsaylor
UTM 400kip
Temperature 72.00 f

Test 4 of 4

DIME Test ID: 2021-03-17-5-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical)
Verified Date: 04/27/2021
Date Tested: 04/20/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples Tested 1
SampleNumber of CyclesSizeMfg. Lot Number(s)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
4No. 6/19mm10.444276097183Service Splicefsaylor
UTM 400kip
Temperature 72.00 f