Sample Record for 2021-03-02-3
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 213750 DEA: 120K0224 EFIS: 1214000097
QA Service Level: 1
DIST-CO-RTE-PM: 12-ORA-5-14.5/17.1
Work Description: South County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS.
Location Description: ORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING
Contractor Name: Flatiron West, Inc
Contractor Address: 1770 La Costa Meadows Drive, San Marcos, California 92078
Resident Engineer: John Hong Structure Rep.: Sara Soleimani
Sample Information
DIME Sample ID: 2021-03-02-3
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 03/02/2021
Date that the sample was received by the laboratory/organization performing the testing: 03/05/2021
The quantity of what the sample constitutes: 1470
A brief description of the sample: #5 welded hoops, 2' 8" dia
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 1202019459
Hoop Manufacturer Lot Number(s): 1, 6 and 10
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #5
Diameter of Hoop: 2'-8"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Nucor Utah
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded
Test Results
Test 1 of 9
DIME Test ID: 2021-03-02-3-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | 5/16mm | 0.31 | 26182.76 | 84461 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 2 of 9
DIME Test ID: 2021-03-02-3-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | 5/16mm | 0.31 | 26234.69 | 84628 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 3 of 9
DIME Test ID: 2021-03-02-3-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | 5/16mm | 0.31 | 26319.62 | 84902 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 4 of 9
DIME Test ID: 2021-03-02-3-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 6 | 5/16mm | 0.31 | 26260.51 | 84711 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 5 of 9
DIME Test ID: 2021-03-02-3-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 6 | 5/16mm | 0.31 | 26695.29 | 86114 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 6 of 9
DIME Test ID: 2021-03-02-3-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 6 | 5/16mm | 0.31 | 26724.87 | 86209 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 7 of 9
DIME Test ID: 2021-03-02-3-7
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 10 | 5/16mm | 0.31 | 26551.68 | 85651 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 8 of 9
DIME Test ID: 2021-03-02-3-8
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 10 | 5/16mm | 0.31 | 26252.66 | 84686 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 9 of 9
DIME Test ID: 2021-03-02-3-9
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 03/08/2021
Date Tested: 03/05/2021
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: 916-227-7257
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 10 | 5/16mm | 0.31 | 26540.30 | 85614 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|