Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 210673 DEA: 042640F4 EFIS: 0400020132 COOP: 042308A3
QA Service Level: 1
DIST-CO-RTE-PM: 04-SON-101-4.0/7.1
Work Description: DESIGN THE NORTHERLY SEGMENT OF THE MARIN-SONOMA NARROWS PROJECT AND INCLUDES SOUND WALLS, BRIDGES, MEDIAN WIDENING AND RAMP WIDENING.
Location Description: JUST NORTH OF THE U.S. 101 AND STATE ROUTE 116 CONNECTION TO 0.3 MILE NORTH OF THE CORONA ROAD OVERCROSSING IN THE CITY OF PETALUMA.
Contractor Name: GHILOTTI CONSTRUCTION CO. INC.
Contractor Address: 246 GHILOTTI AVENUE, SANTA ROSA, CA 95407
Resident Engineer: Richard Duncan Structure Rep.: Beaudoin, Brian
Sample Information
DIME Sample ID: 2020-10-12-7
TL Number from the TL Form: C918528
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (916) 227-7253
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 10/12/2020
Date that the sample was received by the laboratory/organization performing the testing: 10/13/2020
The quantity of what the sample constitutes: 4
A brief description of the sample: Erico Lenton Stander A2 Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: cascade Erico Lenton PSO Reinforcing
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Cascade nucor
Coupler Manufacturer: Erico Lenton
Intermediate Assembler or Fabricator:
Rebar Size: #11
Coupler Model: Lenton A2
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter:
Rebar Hoop Fabricator:
Coupler Component Heat/Lot Number(s): L9678
Rebar Heat Number(s): 3500013324
Rebar Size 2 :
Test Results
Test 1 of 3
DIME Test ID: 2020-10-12-7-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 10/14/2020
Date Tested: 10/13/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: (916) 227-7253
General Comments for this Test: Service Splice
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | | No. 11/36mm | 1 | -0.0016 | 1.56 | 146538 | 93935 | Service Splice | fsaylor |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
Small
|
Test 2 of 3
DIME Test ID: 2020-10-12-7-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 10/14/2020
Date Tested: 10/13/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: (916) 227-7253
General Comments for this Test: Service Splice
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | | No. 11/36mm | 1 | 0 | 1.56 | 149026 | 95529 | Service Splice | fsaylor |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Test 3 of 3
DIME Test ID: 2020-10-12-7-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Verified Date: 10/14/2020
Date Tested: 10/13/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: paul.lukkarila@dot.ca.gov
Organization Phone: (916) 227-7253
General Comments for this Test: Service Splice
Additional Comments When Verified:
Number of Samples Tested
|
1
|
Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | | No. 11/36mm | 1 | 0 | 1.56 | 144476 | 92613 | Service Splice | fsaylor |
| |
UTM
|
2000kip
|
Temperature
|
72.00 f
|
Halo ID
|
|
Tests Assigned to this Sample
DIME Test ID | Test Method | Assigned Date | Test Date | Assigned By | Assigned Lab | Test Comments | Assigned To |
No tests have been assigned to this sample. |