Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 033H4504 Cty ED Rte 50 PM 33.8/34.2 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Jody Phillips |
Date Reported: |
10/27/2020 |
|
Address: |
TL Number: |
10 |
||
City: |
||||
Project Name: CONSTRUCT RW, WIDEN RDWY, COLD PLANE AC PVMT, & HMA OVERLAY. |
||||
Prime Contractor: BRIDGEWAY CIVIL CONSTRUCTORS, INC. |
||||
Sample Taken Date: |
09/29/2020 |
Mix Design: |
CTO72CR5WA |
|
Contractor: Unknown |
Location: EL DORADO COUNTY AT FRESH POND FROM 0.6 TO 0.2 MILE WEST OF FOREST ROAD/OUTER LIMITS LANE |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.02 | 28.46 | 116096 | 4079.0 | 1 |
2 | 6.00 | 28.27 | 123453 | 4366.0 | 1 |
DIME Test ID: 2020-09-29-25-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 4220
Age of specimen: 28 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing