Project Information

Project ID: 215041 DEA: 031J1904 EFIS: 0320000169 QA Service Level: 1
DIST-CO-RTE-PM: 03-YUB,YUB/SUT-70,70,99-Var
Work Description: In-kind restoration pvmt. repair w/HMA medium overlay, striping, traffic control, incidental work
Location Description: Yubat & Sutter Counties at various locaitons
Contractor Name: George Reed INC
Contractor Address: 140 Empire Avenue, Modesto, CA 95354
Resident Engineer: Donald Ward Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2020-06-16-52
TL Number from the TL Form:
Sample Submitted By Organization: CT D03 - Olivehurst Northern Regional Laboratory
Sample Organization Contact: (530) 741-4238
Type of Sample: Verification
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 06/16/2020
Date that the sample was received by the laboratory/organization performing the testing: 06/16/2020
The quantity of what the sample constitutes: JMF Verification
A brief description of the sample: 3/4 inch HMA-A
From where was the sample collected: Manufacturer
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: George Reed - Rio Linda

Material Information

RAP Source: Clements Hot Plant
Aggregate Size:
Aggregate Source:
RAP Stockpile:
Stockpile Size (tons):
Reclaimed Asphalt Pavement Mix Number:

Test Results

Test 1 of 3

DIME Test ID: 2020-06-16-52-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Verified Date: 09/14/2020
Date Tested: 07/30/2020
Submitted By Organization: CT D03 - Olivehurst Northern Regional Laboratory
Organization Address: 5330 Arboga Road,
Organization City: Olivehurst
Organization State: CA
Organization Zipcode: 95961
Organization Email: jeff.herbert@dot.ca.gov
Organization Phone: (530) 741-4238
General Comments for this Test: JMF20-025
Test Result Compliance: complies
Additional Comments When Verified:
What temperature unit is used? Fahrenheit
Test procedure used? Method A
Mass of HMA Sample prior to ignition no data
Corrected Asphalt Binder Content 4.23 %
Mass Loss no data
Correction Factor (Percent by mass of HMA Specimen) no data
Moisture Content no data
Temperature Compensation Factor no data
Test Temperature no data

Test 2 of 3

DIME Test ID: 2020-06-16-52-2
Test Method: AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 09/14/2020
Date Tested: 07/30/2020
Submitted By Organization: CT D03 - Olivehurst Northern Regional Laboratory
Organization Address: 5330 Arboga Road,
Organization City: Olivehurst
Organization State: CA
Organization Zipcode: 95961
Organization Email: jeff.herbert@dot.ca.gov
Organization Phone: (530) 741-4238
General Comments for this Test: JMF20-025
Test Result Compliance: complies
Additional Comments When Verified:
Number of tests 1
What is the unit of measurement for theoretical density? US Units
Mass Determination Air
Specific Gravity for Sample 1 2.605
Theoretical maximum density at 25°C (77°F) no data

Test 3 of 3

DIME Test ID: 2020-06-16-52-3
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Verified Date: 09/14/2020
Date Tested: 07/30/2020
Submitted By Organization: CT D03 - Olivehurst Northern Regional Laboratory
Organization Address: 5330 Arboga Road,
Organization City: Olivehurst
Organization State: CA
Organization Zipcode: 95961
Organization Email: jeff.herbert@dot.ca.gov
Organization Phone: (530) 741-4238
General Comments for this Test: JMF20-025
Test Result Compliance: complies
Additional Comments When Verified: JMF20-025
Cumulative percent passing the 3 in. sieve 100 %
Cumulative percent passing the 2 1/2 in. sieve 100 %
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 100 %
Cumulative percent passing the 3/8 in. sieve 98 %
Cumulative percent passing the #4 sieve 74 %
Cumulative percent passing the #8 sieve 54 %
Cumulative percent passing the #16 sieve 41 %
Cumulative percent passing the #30 sieve 30 %
Cumulative percent passing the #50 sieve 21 %
Cumulative percent passing the #100 sieve 15 %
Cumulative percent passing the #200 sieve 10.9 %