Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 214731 DEA: 051M0004 EFIS: 0519000047
QA Service Level: 1
DIST-CO-RTE-PM: 05-SLO-101-16.5/R21.5
Work Description: COLD PLANE AND RHMA-GAP GRADED OVERLAY ON EXISTING ROADWAY.
Location Description: SAN LUIS OBISPO COUNTY IN AND NEAR PISMO BEACH FROM 0.1 MILE SOUTH OF PRICE CANYON ROAD TO SAN LUIS CREEK BRIDGE
Contractor Name: PAPICH CONSTRUCTION COMPANY, INC.
Contractor Address: 398 SUNRISE TERRACE, ARROYO GRANDE, CA 93425
Resident Engineer: Lilian Bennetzen Structure Rep.: Unknown
DIME Sample ID: 2020-08-19-22
TL Number from the TL Form: 023683
Sample Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Department Acceptance
Type of Material: Asphalt Binder
Sample Taken Date: 08/19/2020
Date that the sample was received by the laboratory/organization performing the testing: 08/24/2020
The quantity of what the sample constitutes: 1 Can
A brief description of the sample: #1 Test, No Test #2(023685),#3(023687),#4(023689), #5(023679), #6(023129), #7023131), #8(023691)
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Sierra Pacific Materials - Templeton
Performance Grade: PG 64-16
Modified: No
Lot number:
Sublot number:
Tank number:
Time of sample:
HMA Supplier:
Certified Asphalt Supplier:
Multigrade:
Multigrade Type:
Asphalt Binder Mix Number:
DIME Test ID: 2020-08-19-22-1
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Verified Date: 09/18/2020
Date Tested: 08/29/2020
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Is mass change based on one or two containers?
|
One
|
Any material loss from containers during heating process/testing?
|
No
|
Mass of empty container #1
|
173.03 grams
|
Mass of container #1 before test (m1i)
|
207.8 grams
|
Mass of container #1 after test (m1f)
|
207.71 grams
|
Average mass change
|
-0.259 percent
|
DIME Test ID: 2020-08-19-22-3
Test Method: AASHTO T315-16: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Verified Date: 09/27/2020
Date Tested: 08/29/2020
Submitted By Organization: CT HQ - Sacramento Asphalt Binder Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Phase
|
Original binder
|
Test Plate Diameter
|
25 mm
|
Test Gap
|
1 mm
|
Test Frequency
|
10.0 rad/s
|
Strain Amplitude
|
12.00 %
|
Stress Amplitude
|
0.184 kPa
|
Phase Angle (δ) (for the 10 cycles)
|
89.2 degree
|
Complex Modulus (G*) (for the 10 measurements)
|
1.536 kPa
|
Test Temperature (Specimen 1)
|
64.0 C
|
Dynamic Shear, G*/sin(δ)
|
1.54 kPa
|