Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 213811 DEA: 112T2184 EFIS: 1116000174
QA Service Level: 1
DIST-CO-RTE-PM: 11-SD-5-R38.4/R47.3
Work Description: (Alternative Delivery) Construct HOV lanes, soundwalls, culvert rehab, ITS, and bike trail on I-5 . NCC I-5 Highway Improvement.
Location Description: IN SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE NORTH OF PALOMAR AIRPORT ROAD OVERCROSSING.
Contractor Name: Flatiron-Skanska-Stacy and Witbeck, a Joint Venture
Contractor Address: 1525 Faraday Ave. #180, Carlsbad, CA 92008
Resident Engineer: Yong Pak Structure Rep.: Cailyn Le
DIME Sample ID: 2020-07-13-25
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Cement Testing Laboratory
Sample Organization Contact: (916) 227-7071
Type of Sample: Quality Assurance
Type of Material: Cementitious
Sample Taken Date: 07/13/2020
Date that the sample was received by the laboratory/organization performing the testing: 07/13/2020
The quantity of what the sample constitutes: 1 bag
A brief description of the sample: Rapid Setting Cement
From where was the sample collected: Job Site
Laboratory sample identification: CM204001
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: C-MAX
DIME Test ID: 2020-07-13-25-2
Test Method: ASTM C109-16a: Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube Specimens)
Verified Date: 08/17/2020
Date Tested: 08/06/2020
Submitted By Organization: CT HQ - Sacramento Cement Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ben.lenz@dot.ca.gov
Organization Phone: (916) 227-7071
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Will control cubes be used per ASTM C311?
|
no
|
Age of specimen
|
3 days
|
The amount of flow
|
107 %
|
The amount of water used
|
50.6 %
|
Compressive strength of 1st specimen
|
2731 psi
|
Compressive strength of 2nd specimen
|
2817 psi
|
Compressive strength of 3rd specimen
|
2905 psi
|
Average Compressive strength (to nearest 10 psi)
|
2820 psi
|
DIME Test ID: 2020-07-13-25-3
Test Method: CTM 527-February 2014: Method of Test for Expansion in Water and Contraction in Air of Portland Cement Mortar
Verified Date: 08/17/2020
Date Tested: 08/10/2020
Submitted By Organization: CT HQ - Sacramento Cement Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ben.lenz@dot.ca.gov
Organization Phone: (916) 227-7071
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Average change in length in water
|
0.01 %
|
Average change in length in air
|
0.02 %
|
DIME Test ID: 2020-07-13-25-4
Test Method: ASTM C1038-14b: Standard Test Method for Expansion of Hydraulic Cement Mortar Bars Stored in Water (Cement Mortar Bars)
Verified Date: 08/17/2020
Date Tested: 08/17/2020
Submitted By Organization: CT HQ - Sacramento Cement Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ben.lenz@dot.ca.gov
Organization Phone: (916) 227-7071
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Specimen A Initial measurement at 24 hours
|
0.2976 in
|
Specimen B Initial measurement at 24 hours
|
0.2979 in
|
Specimen C Initial measurement at 24 hours
|
0.2671 in
|
Specimen D Initial measurement at 24 hours
|
0.263 in
|
Specimen A Final measurement at 14 days
|
0.2977 in
|
Specimen B Final measurement at 14 days
|
0.298 in
|
Specimen C Final measurement at 14 days
|
0.2673 in
|
Specimen D Final measurement at 14 days
|
0.2631 in
|
The average length of change of the four specimens
|
0.001 %
|
DIME Test ID: 2020-07-13-25-6
Test Method: CTM 553-1: Method for Testing Thermal Stability of Mortar Made with Hydraulic Cement
Verified Date: 08/17/2020
Date Tested: 08/06/2020
Submitted By Organization: CT HQ - Sacramento Cement Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: ben.lenz@dot.ca.gov
Organization Phone: (916) 227-7071
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Cross-sectional area of the specimen
|
4 in^2
|
Age at the time of test
|
72 hours
|
Maximum load at failure of specimen 1, 23 ± 1.7°C for 48h
|
11697 lbs
|
Maximum load at failure of specimen 2, 23 ± 1.7°C for 48h
|
10838 lbs
|
Maximum load at failure of specimen 3, 23 ± 1.7°C for 48h
|
10245 lbs
|
Average of test specimens broken to nearest 50 kPa, 23 ± 1.7°C for 48h
|
18850 kPa
|
Maximum load at failure of specimen 1, 50 ± 1°C for 48h
|
19769 lbs
|
Maximum load at failure of specimen 2, 50 ± 1°C for 48h
|
20738 lbs
|
Maximum load at failure of specimen 3, 50 ± 1°C for 48h
|
21383 lbs
|
Average of test specimens broken to nearest 50 kPa, 50 ± 1°C for 48h
|
35560 kPa
|
Thermal stability ratio
|
189
|