Project Information

Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 QA Service Level: 1
DIST-CO-RTE-PM: 03-SAC-99-7.92 / 8.4
Work Description: Remove and replace Consumnes River and Consumnes River Overflow bridge
Location Description: Sacramento County
Contractor Name: GRANITE CONSTRUCTION COMPANY
Contractor Address: 4001 Bradshaw Road, Sacramento, CA 95827
Resident Engineer: Masoud Saed Structure Rep.: Chau Ha

Sample Information

DIME Sample ID: 2020-06-26-1
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Materials Management Branch Field Office
Sample Organization Contact: (562) 500-5861
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 06/26/2020
Date that the sample was received by the laboratory/organization performing the testing: 06/26/2020
The quantity of what the sample constitutes: 4
A brief description of the sample: #8 6-2" diameter
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: CMC Etiwanda

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 4094312
Hoop Manufacturer Lot Number(s): 1
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #8
Diameter of Hoop: 6'-2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC
Welding Company: CMC Rebar (Etiwanda)
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 3

DIME Test ID: 2020-06-26-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/29/2020
Date Tested: 06/29/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
118/25mm0.7976282.0496560Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 2 of 3

DIME Test ID: 2020-06-26-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/29/2020
Date Tested: 06/29/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
218/25mm0.7976217.7796478Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 3 of 3

DIME Test ID: 2020-06-26-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/29/2020
Date Tested: 06/29/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
318/25mm0.7976115.8596349Ok Neckingbewing
UTM 400kip
Temperature 72 f