Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 030F2844 Cty SAC Rte 99 PM 7.1/9.4 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Masoud Saed |
Date Reported: |
06/23/2020 |
|
Address: |
TL Number: |
173240 |
||
City: |
||||
Project Name: Construct new PCC precast girder bridge over UPRR at McConnell OH between existing SB and NB alignments |
||||
Prime Contractor: GRANITE CONSTRUCTION COMPANY |
||||
Sample Taken Date: |
06/16/2020 |
Mix Design: |
1418897 |
|
Contractor: Unknown |
Location : |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 5.98 | 28.09 | 168366 | 5995.0 | 1 |
2 | 5.98 | 28.09 | 164882 | 5871.0 | 1 |
DIME Test ID: 2020-06-16-17-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 5930
Age of specimen: 7 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing