Print Report | Back to Sample Detail

Sample Record for 2020-06-17-2

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214426 DEA: 030A5704 EFIS: 0300020593 QA Service Level: 1
DIST-CO-RTE-PM: 03-YUB-20-13.3/R18.2
Work Description: Browns Valley Rehab: CONSTRUCT BRIDGE, REALIGN CURVE, WIDEN SHOULDERS AND CULVERT WORK.
Location Description: YUBA COUNTY FROM MARYSVILLE ROAD TO THE YUBA RIVER BRIDGE
Contractor Name: A. TEICHERT & SON, INC. DBA TEICHERT CONSTRUCTION
Contractor Address: 400 Sunrise Ave, Suite 300, Roseville, CA 95661
Resident Engineer: Garrett Griffith Structure Rep.: Matt Crete

Sample Information

DIME Sample ID: 2020-06-17-2
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 06/17/2020
Date that the sample was received by the laboratory/organization performing the testing: 06/19/2020
The quantity of what the sample constitutes: 1 lot of 150 plus 1 lot of 78
A brief description of the sample: #8 rebar hoops 5'-2" dia
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: TNT Rebar

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 119520
Hoop Manufacturer Lot Number(s): 1 and 4
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #8
Diameter of Hoop: 5'-2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Cascade Steel
Welding Company: TNT Rebar
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 6

DIME Test ID: 2020-06-17-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/23/2020
Date Tested: 06/23/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
118/25mm0.7974463.6694258Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 2 of 6

DIME Test ID: 2020-06-17-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/23/2020
Date Tested: 06/23/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
218/25mm0.7974465.5694260Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 3 of 6

DIME Test ID: 2020-06-17-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/23/2020
Date Tested: 06/23/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
318/25mm0.7974583.4194409Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 4 of 6

DIME Test ID: 2020-06-17-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/23/2020
Date Tested: 06/23/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
148/25mm0.7976568.2496922Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 5 of 6

DIME Test ID: 2020-06-17-2-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/23/2020
Date Tested: 06/23/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
248/25mm0.7976744.0397144Ok Neckingbewing
UTM 400kip
Temperature 72 f

Test 6 of 6

DIME Test ID: 2020-06-17-2-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/23/2020
Date Tested: 06/23/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
348/25mm0.7976659.1897037Ok Neckingbewing
UTM 400kip
Temperature 72 f