Print Report | Back to Sample Detail

Sample Record for 2020-04-20-23

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 214589 DEA: 020J1604 QA Service Level: 1
DIST-CO-RTE-PM: 02-PLU-284-0.0/8.3
Work Description: PLACE HMA (TYPE A), PRECOATED AGGREGATE (SEAL COAT), HMA (LEVELING).
Location Description: PLUMAS COUNTY NEAR CHILCOOT FROM ROUTE 70 TO 1 MILE NORTH OF LITTLE LAST CHANCE CREEK BRIDGE NUMBER 09-0072
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2020-04-20-23
TL Number from the TL Form: 733182
Sample Submitted By Organization: CT D02 - North Region Materials Lab
Sample Organization Contact: (530) 225-3194
Type of Sample: Verification
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 04/20/2020
Date that the sample was received by the laboratory/organization performing the testing: 04/21/2020
The quantity of what the sample constitutes: JMF Verification
A brief description of the sample: Fine RAP, 3/8-inch
From where was the sample collected: Manufacturer
Laboratory sample identification: D78408B
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Ward Lake Pit

Material Information

RAP Source: Ward Lake
Aggregate Size: 3/8-inch
Aggregate Source: Unknown
RAP Stockpile:
Stockpile Size (tons): Unknown

Test Results

Test 1 of 3

DIME Test ID: 2020-04-20-23-1
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Verified Date: 06/11/2020
Date Tested: 04/23/2020
Submitted By Organization: CT D02 - North Region Materials Lab
Organization Address: 1657 Riverside Dr,MS-83
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: (530) 225-3194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Asphalt Binder Content 7.67 %
Correction Factor (Percent by mass of HMA Specimen) 0 %

Test 2 of 3

DIME Test ID: 2020-04-20-23-2
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 06/11/2020
Date Tested: 04/23/2020
Submitted By Organization: CT D02 - North Region Materials Lab
Organization Address: 1657 Riverside Dr,MS-83
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: (530) 225-3194
General Comments for this Test:
Test Result Compliance:
Additional Comments When Verified:
Does this test use 1/4 sieve? Yes
Total mass of material in the sample 1429.4 grams
Mass retained on the 2 in. sieve 0 grams
Cumulative mass retained on the 1 1/2 in. sieve 0 grams
Cumulative mass retained on the 1 in. sieve 0 grams
Cumulative mass retained on the 3/4 in. sieve 0 grams
Cumulative mass retained on the 1/2 in. sieve 2.8 grams
Cumulative mass retained on the 3/8 in. sieve 15.6 grams
Mass retained on the 1/4 in. sieve 189.9 grams
Cumulative mass retained on the #4 sieve 321.5 grams
Cumulative mass retained on the #8 sieve 594.3 grams
Cumulative mass retained on the #16 sieve 803 grams
Cumulative mass retained on the #30 sieve 957.9 grams
Cumulative mass retained on the #50 sieve 1087.5 grams
Cumulative mass retained on the #100 sieve 1190.2 grams
Cumulative mass retained on the #200 sieve 1253.6 grams
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 99.8 %
Cumulative percent passing the 3/8 in. sieve 98.9 %
Cumulative percent passing the 1/4 in. sieve 86.7 %
Cumulative percent passing the #4 sieve 77.5 %
Cumulative percent passing the #8 sieve 58.4 %
Cumulative percent passing the #16 sieve 43.8 %
Cumulative percent passing the #30 sieve 33 %
Cumulative percent passing the #50 sieve 23.9 %
Cumulative percent passing the #100 sieve 16.7 %
Cumulative percent passing the #200 sieve 12.3 %

Test 3 of 3

DIME Test ID: 2020-04-20-23-3
Test Method: AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)
Verified Date: 06/11/2020
Date Tested: 04/24/2020
Submitted By Organization: CT D02 - North Region Materials Lab
Organization Address: 1657 Riverside Dr,MS-83
Organization City: Redding
Organization State: CA
Organization Zipcode: 96001
Organization Email: ward.jenkins@dot.ca.gov
Organization Phone: (530) 225-3194
General Comments for this Test:
Test Result Compliance: complies
Additional Comments When Verified:
Number of tests 1
Mass Determination Air
Method Performed Mechanical Agitation - Method A
Mass of container filled with water 7338.0 grams
Mass of oven-dry sample in air for Sample 1 1555.0 grams
Mass of container filled with the sample and water for Sample 1 8257.0 grams
Temperature of Water 77 °F
Specific Gravity for Sample 1 2.445

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
No tests have been assigned to this sample.