Sample Record for 2020-06-01-2
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 214176 DEA: 033F0904 EFIS: 0312000056
QA Service Level: 1
DIST-CO-RTE-PM: 03-SAC,SJ-5,160-Var
Work Description: REPLACE STRUCTURAL CONCRETE BRIDGES, PLACE CIDH & CISS CONCRETE PILES.
Location Description: SACRAMENTO COUNTY AT NORTH SACRAMENTO UNDERCROSSING AND SACRAMENTO RIVER BRIDGE AND IN SAN JOAQUIN COUNTY AT MOKELUMNE RIVER BRIDGE
Contractor Name: Myers & Sons Construction
Contractor Address: 4600 Northgate Boulevard, Suite 100, Sacramento, CA 95834-1121
Resident Engineer: Mohssen Ghassemi Structure Rep.: Chuck Pazzi
Sample Information
DIME Sample ID: 2020-06-01-2
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 06/01/2020
Date that the sample was received by the laboratory/organization performing the testing: 06/05/2020
The quantity of what the sample constitutes: Each lot size 150
A brief description of the sample: #7 rebar 3' - 5.2"
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 127120
Hoop Manufacturer Lot Number(s): 13 and 18
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: #7
Diameter of Hoop: 3'-5.2"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Cascade Steel
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded
Test Results
Test 1 of 6
DIME Test ID: 2020-06-01-2-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/04/2020
Date Tested: 06/04/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 13 | 7/22mm | 0.6 | 58045.55 | 96743 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 2 of 6
DIME Test ID: 2020-06-01-2-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/04/2020
Date Tested: 06/04/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 13 | 7/22mm | 0.6 | 58126.94 | 96878 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 3 of 6
DIME Test ID: 2020-06-01-2-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/04/2020
Date Tested: 06/04/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 13 | 7/22mm | 0.6 | 58245.41 | 97076 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 4 of 6
DIME Test ID: 2020-06-01-2-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/04/2020
Date Tested: 06/04/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 18 | 7/22mm | 0.6 | 57826.77 | 96378 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 5 of 6
DIME Test ID: 2020-06-01-2-5
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/04/2020
Date Tested: 06/04/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 18 | 7/22mm | 0.6 | 57672.75 | 96121 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 6 of 6
DIME Test ID: 2020-06-01-2-6
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 06/04/2020
Date Tested: 06/04/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Ok Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 18 | 7/22mm | 0.6 | 58007.93 | 96680 | Ok Necking | bewing |
| |
UTM
|
400kip
|
Temperature
|
72 f
|