Print Report | Back to Sample Detail

Sample Record for 2020-05-26-1

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 210673 DEA: 042640F4 EFIS: 0400020132 COOP: 042308A3 QA Service Level: 1
DIST-CO-RTE-PM: 04-SON--
Work Description:
Location Description:
Contractor Name: GHILOTTI CONSTRUCTION CO. INC.
Contractor Address: 246 GHILOTTI AVENUE, SANTA ROSA, CA 95407
Resident Engineer: Gina Choi Structure Rep.: Brian Beaudoin

Sample Information

DIME Sample ID: 2020-05-26-1
TL Number from the TL Form: C744077
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 05/26/2020
Date that the sample was received by the laboratory/organization performing the testing: 05/26/2020
The quantity of what the sample constitutes: 4
A brief description of the sample: HRC 500 510 Couplers
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Pacitic Steel group Nucor HRC

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Nucor
Coupler Manufacturer: HRC
Intermediate Assembler or Fabricator: Unknown
Rebar Size: #14
Coupler Model: HRC 500-510
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 73115485 73115263
Rebar Heat Number(s): SE17100590
Rebar Size 2 :
Coupler Unique ID:

Test Results

Test 1 of 4

DIME Test ID: 2020-05-26-1-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
Data has not been verified.

Test 2 of 4

DIME Test ID: 2020-05-26-1-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
Data has not been verified.

Test 3 of 4

DIME Test ID: 2020-05-26-1-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
Data has not been verified.

Test 4 of 4

DIME Test ID: 2020-05-26-1-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
Data has not been verified.