Sample Record for 2020-01-15-3
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 211260 DEA: 072159U4 EFIS: 0715000160
QA Service Level: 1
DIST-CO-RTE-PM: 07-LA,ORA-5-0.0/1.5, 44.3/44.4
Work Description: CONSTRUCT HOV LANES AND MIX FLOW LANES.
Location Description: LOS ANGELES AND ORANGE COUNTIES IN BUENA PARK, LA MIRADA, CERRITOS AND SANTA FE SPRINGS FROM ARTESIA BOULEVARD UNDERCROSSING TO NORTH FORK COYOTE CREEK
Contractor Name: SECURITY PAVING COMPANY, INC.
Contractor Address: 3075 TOWNSGATE RD. SUITE 200, WESTLAKE VILLAGE, CA 91361
Resident Engineer: George Saker Structure Rep.: Danny Lalonde
Sample Information
DIME Sample ID: 2020-01-15-3
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Retest
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 01/15/2020
Date that the sample was received by the laboratory/organization performing the testing: 01/17/2020
The quantity of what the sample constitutes: 4 Samples from lot 32A
A brief description of the sample: #6 rebar 2'-10" Hoop
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding
Material Information
Production or Authorization Testing: Retest
Service or Ultimate: Ultimate
Rebar Heat Number(s): 9000798
Hoop Manufacturer Lot Number(s): 32a
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 6
Diameter of Hoop: 2'-10"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: CMC Steel California
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded
Test Results
Test 1 of 4
DIME Test ID: 2020-01-15-3-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/22/2020
Date Tested: 01/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 32A | 6/19mm | 0.44 | 44686.75 | 101561 | OK Necking | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 2 of 4
DIME Test ID: 2020-01-15-3-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/22/2020
Date Tested: 01/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 32A | 6/19mm | 0.44 | 44876.39 | 101992 | OK Necking | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 3 of 4
DIME Test ID: 2020-01-15-3-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/22/2020
Date Tested: 01/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Bar Broke in Heat Affected Zone
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 32A | 6/19mm | 0.44 | 39067.86 | 88791 | Bar Broke in Heat Affected Zone | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 4 of 4
DIME Test ID: 2020-01-15-3-4
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 01/22/2020
Date Tested: 01/21/2020
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 4 | 32A | 6/19mm | 0.44 | 44829.58 | 101885 | OK Necking | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72 f
|