Sample Record for 2019-09-25-32

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 66667 DEA: JMFPP EFIS: 0019000043 QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-09-25-32
TL Number from the TL Form:
Sample Submitted By Organization: CT D01 - District 1 Materials Laboratory
Sample Organization Contact: (707) 496-0974
Type of Sample: Quality Control
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 09/25/2019
Date that the sample was received by the laboratory/organization performing the testing: 11/01/2019
The quantity of what the sample constitutes: JMF Prequalification
A brief description of the sample: RAP
From where was the sample collected: Manufacturer
Laboratory sample identification: 19-263
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Syar Lake Herman Batch

Material Information

RAP Source: Lake Herman Quarry
Aggregate Size: 0.5 in Minus
Aggregate Source: Unknown
RAP Stockpile: Static
Stockpile Size (tons): 3200
Reclaimed Asphalt Pavement Mix Number:

Test Results

Test 1 of 1

DIME Test ID: 2019-09-25-32-1
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 12/02/2019
Date Tested: 12/02/2019
Submitted By Organization: CT D01 - District 1 Materials Laboratory
Organization Address: 1726 Albee Street,
Organization City: Eureka
Organization State: CA
Organization Zipcode: 95501
Organization Email: leif.ayres@dot.ca.gov
Organization Phone: (707) 496-0974
General Comments for this Test: RAP
Test Result Compliance:
Additional Comments When Verified:
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 100 %
Cumulative percent passing the 3/8 in. sieve 100 %
Cumulative percent passing the 1/4 in. sieve 100 %
Cumulative percent passing the #4 sieve 79 %
Cumulative percent passing the #8 sieve 58 %
Cumulative percent passing the #16 sieve 42 %
Cumulative percent passing the #30 sieve 32 %
Cumulative percent passing the #50 sieve 22 %
Cumulative percent passing the #100 sieve 14 %
Cumulative percent passing the #200 sieve 9.6 %