Print Report | Back to Sample Detail

Sample Record for 2019-11-13-3

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 213764 DEA: 080F0304 EFIS: 0800020358 QA Service Level: 1
DIST-CO-RTE-PM: 08-SBD-60-R0.7/R3.0
Work Description: REMOVE AND REPLACE THREE OVERCROSSING BRIDGES ON ROUTE 60
Location Description: IN SAN BERNARDINO COUNTY IN AND NEAR CHINO AT VARIOUS LOCATIONS FROM O.1 MILE WEST OF PIPELINE AVENUE OVERCROSSING TO 0.1 MILE EAST OF BENSON AVENUE OVERCROSSING
Contractor Name: SEMA CONSTRUCTION, INC.
Contractor Address: 42690 Rio Nedo, Suite G, Temecula, CA 92590
Resident Engineer: Joseph Lopez Structure Rep.: Rodrigo Santa Cruz

Sample Information

DIME Sample ID: 2019-11-13-3
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - QASI Los Angeles Field Office
Sample Organization Contact: (858) 285-5797
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Welded Hoops
Sample Taken Date: 11/13/2019
Date that the sample was received by the laboratory/organization performing the testing: 11/15/2019
The quantity of what the sample constitutes: 128
A brief description of the sample: #7 x 3'-8" flash welded hoop
From where was the sample collected: Fabricator
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: RKR Steel Welding

Material Information

Production or Authorization Testing: Production Testing
Service or Ultimate: Ultimate
Rebar Heat Number(s): 078119
Hoop Manufacturer Lot Number(s): 7
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Size: 7
Diameter of Hoop: 3'-8"
Epoxy Coated: No
Epoxy Coating Color: NA
Rebar Manufacturer: Cascade Steel
Welding Company: RKR Steel Welding
Coating Standards: Uncoated
Weld Type: Flash Welded

Test Results

Test 1 of 3

DIME Test ID: 2019-11-13-3-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/15/2019
Date Tested: 11/15/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
177/22mm0.658541.4897569OK Neckingbewing
UTM 400kip
Temperature 72 f

Test 2 of 3

DIME Test ID: 2019-11-13-3-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/15/2019
Date Tested: 11/15/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
277/22mm0.658621.9097703OK Neckingbewing
UTM 400kip
Temperature 72 f

Test 3 of 3

DIME Test ID: 2019-11-13-3-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 11/15/2019
Date Tested: 11/15/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: OK Necking
Test Result Compliance:
Additional Comments When Verified:
Number of Samples 1
SampleMfg. Lot Number(s)SizeArea (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
377/22mm0.658714.3197857OK Neckingbewing
UTM 400kip
Temperature 72 f