Print Report | Back to Sample Detail

Sample Record for 2019-09-27-30

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 66667 DEA: JMFPP EFIS: 0019000043 QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-09-27-30
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Concrete Testing Laboratory
Sample Organization Contact: (916) 227-7283
Type of Sample: Quality Control
Type of Material: Reclaimed Asphalt Pavement
Sample Taken Date: 09/27/2019
Date that the sample was received by the laboratory/organization performing the testing:
The quantity of what the sample constitutes: 1
A brief description of the sample: 1/2 inch HMA-SP WMA PG 64-16
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: SYAR Lake Herman Drum

Material Information

RAP Source: Stockpile@Plant
Aggregate Size:
Aggregate Source:
RAP Stockpile:
Stockpile Size (tons):

Test Results

Test 1 of 2

DIME Test ID: 2019-09-27-30-1
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Verified Date: 10/29/2019
Date Tested: 09/27/2019
Submitted By Organization: CT HQ - Sacramento Concrete Testing Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: larry.mccrum@dot.ca.gov
Organization Phone: (916) 227-7283
General Comments for this Test: RAP Sample 1A T30
Test Result Compliance:
Additional Comments When Verified:
Cumulative percent passing the 2 in. sieve 100 %
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 100 %
Cumulative percent passing the 1/2 in. sieve 100 %
Cumulative percent passing the 3/8 in. sieve 99.7 %
Cumulative percent passing the 1/4 in. sieve 99.7 %
Cumulative percent passing the #4 sieve 86.4 %
Cumulative percent passing the #8 sieve 66.1 %
Cumulative percent passing the #16 sieve 48.1 %
Cumulative percent passing the #30 sieve 35.7 %
Cumulative percent passing the #50 sieve 25.2 %
Cumulative percent passing the #100 sieve 15.4 %
Cumulative percent passing the #200 sieve 10.1 %

Test 2 of 2

DIME Test ID: 2019-09-27-30-2
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Asphalt Binder Content)
Verified Date: 10/29/2019
Date Tested: 09/27/2019
Submitted By Organization: CT HQ - Sacramento Concrete Testing Laboratory
Organization Address: 5900 Folsom Blvd,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: larry.mccrum@dot.ca.gov
Organization Phone: (916) 227-7283
General Comments for this Test: RAP Sample 1A T308
Test Result Compliance:
Additional Comments When Verified:
Asphalt Binder Content 6.56 %
Correction Factor (Percent by mass of HMA Specimen) no data

Tests Assigned to this Sample

DIME Test IDTest MethodAssigned DateTest DateAssigned ByAssigned LabTest CommentsAssigned To
No tests have been assigned to this sample.