Gavin Newsom, Governor |
DEPARTMENT OF TRANSPORTATIONDIVISION OF ENGINEERING SERVICES MATERIALS ENGINEERING AND TESTING SERVICES Concrete Materials Testing Branch 5900 Folsom Blvd. Sacramento, CA 95819 916-227-7205 |
Contract # 042640N4 Cty MRN Rte 101 PM MRN27.0/27.6SON0.0/4.5 Vendor # |
REPORT OF LABORATORY TESTING |
||||
Resident Engineer: |
Hal Streater |
Date Reported: |
09/17/2019 |
|
Address: |
TL Number: |
280668 |
||
City: |
||||
Project Name: CONSTRUCT HOV LANES |
||||
Prime Contractor: GHILOTTI CONSTRUCTION COMPANY |
||||
Sample Taken Date: |
08/20/2019 |
Mix Design: |
00000000 |
|
Contractor: Unknown |
Location : MARIN AND SONOMA COUNTIES IN AND NEAR PETALUMA FROM 0.6 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE TO 0.3 MILE SOUTH OF EAST WASHINGTON STREET OVER CROSSING |
|||
Structure unique identifier: |
||||
Structure name: |
||||
Location of Pour: Unknown |
The following testing has been tested in accordance with:
ASTM C39-17a : Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
Capped in accordance with ASTM C617/CTM521
Cured in accordance with ASTM C511
Specimen | Average diameter of cylinder (in) | Cross sectional area of cylinder (in^2) | Maximum load on cylinder (lb) | Compressive strength of cylinder (psi) | Type of fracture pattern of cylinder |
---|---|---|---|---|---|
1 | 6.02 | 28.45 | 147437 | 5182.3 | 1 |
2 | 6.01 | 28.35 | 148482 | 5237.5 | 1 |
DIME Test ID: 2019-08-20-3-1
Number of specimens: 2
Compressive strength (to nearest 10 psi): 5210
Age of specimen: 28 days
Certified By: Larry McCrum
*Subject to final inspection by the Resident Engineer. |
TL- Report of Laboratory Testing