Project Information

Project ID: 213050 DEA: 051J5204 EFIS: 0517000195 QA Service Level: 1
DIST-CO-RTE-PM: 05-SLO-58-6.9/30.0
Work Description: COLD PLANE EXISTING ROADWAY AND RESURFACE WITH RHMA-G.
Location Description: SAN LUIS OBISPO COUNTY ABOUT 6 MILES EAST OF SANTA MARGARITA FROM ROUTE 229 TO NAVAJO CREEK BRIDGE
Contractor Name: PAPICH CONSTRUCTION COMPANY, INC.
Contractor Address: P.O. Box 2210, Pismo Beach, CA 93448
Resident Engineer: Lilian Bennetzen Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-04-15-20
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Dispute Resolution
Type of Material: Aggregate
Sample Taken Date: 04/15/2019
Date that the sample was received by the laboratory/organization performing the testing: 04/15/2019
The quantity of what the sample constitutes: 1
A brief description of the sample: 3/4 inch RHMA-G
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Papich Construction

Material Information

Source Identification (SMARA, name of Pit or Job Site): 91-10-0006
The fabricator's/manufacturer's product name for the sample: Unknown
The fabricator/manufacturer designation for the sample: Unknown
The plant number: Unknown
A detailed description of where the material sample was collected: Stockpile @ Plant
Where the material sample would have been placed if not sampled: Unknown
Primary Aggregate Nominal Size: 3/4 inch
The concrete mix design number: Unknown
Lot number: Unknown
Sublot number: Unknown
Aggregate Mix Number:

Test Results

Test 1 of 1

DIME Test ID: 2019-04-15-20-1
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Verified Date: 12/17/2019
Date Tested: 04/15/2019
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: Translab internal lab no.:019-004 CT Lab no. 18-A-518 Lot2 Sublot3
Test Result Compliance:
Additional Comments When Verified:
What type of gradation is being tested? HMA Gradation
Cumulative percent passing the 1 1/2 in. sieve 100 %
Cumulative percent passing the 1 in. sieve 100 %
Cumulative percent passing the 3/4 in. sieve 99.5 %
Cumulative percent passing the 1/2 in. sieve 86 %
Cumulative percent passing the 3/8 in. sieve 82.3 %
Cumulative percent passing the 1/4 in. sieve 100 %
Cumulative percent passing the #4 sieve 59.8 %
Cumulative percent passing the #8 sieve 36.7 %
Cumulative percent passing the #16 sieve 26 %
Cumulative percent passing the #30 sieve 18.8 %
Cumulative percent passing the #50 sieve 12.3 %
Cumulative percent passing the #100 sieve 6.3 %
Cumulative percent passing the #200 sieve 3.14 %