Sample Record for 2019-08-15-7
Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project Information
Project ID: 213846 DEA: 041J5614 EFIS: 0419000117
QA Service Level: 1
DIST-CO-RTE-PM: 04-SM-101-0.0/6.7
Work Description: Barrier modifications, overhead signs, freeway lighting and electronic toll system components
Location Description: SANTA CLARA AND SAN MATEO COUNTIES IN PALO ALTO AND REDWOOD CITY FROM 0.3 MILE NORTH OF SAN ANTONIO ROAD TO WHIPPLE AVENUE OVERCROSSING
Contractor Name: KIEWIT INFRASTRUCTURE WEST CO
Contractor Address: 390 Bridge Parkway Suite 210, Redwood City, CA 94065
Resident Engineer: Doug Inori Structure Rep.: Tyler Pinell
Sample Information
DIME Sample ID: 2019-08-15-7
TL Number from the TL Form: C835652
Sample Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Organization Contact: (530) 329-6527
Type of Sample: Quality Assurance
Type of Material: SMTL TM5 - Couplers
Sample Taken Date: 08/15/2019
Date that the sample was received by the laboratory/organization performing the testing: 08/16/2019
The quantity of what the sample constitutes: 4
A brief description of the sample: Double Barrel Zap Screwlok
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Barsplice, Nucor
Material Information
Production or Authorization Testing: Production Testing
Service or Ultimate: Service
Material Standard Code: ASTM A706
Material Grade: 60
Rebar Manufacturer: Nucor
Coupler Manufacturer: BarSplice
Intermediate Assembler or Fabricator: Unknown
Rebar Size: 5
Coupler Model: Double Barrel Zap Screwlok
Coating Standards: Uncoated
Shape of Rebar: Straight
Rebar Hoop Diameter: Unknown
Rebar Hoop Fabricator: Unknown
Coupler Component Heat/Lot Number(s): 9003
Rebar Heat Number(s): 3500005739
Rebar Size 2 :
Coupler Unique ID:
Test Results
Test 1 of 3
DIME Test ID: 2019-08-15-7-1
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/19/2019
Date Tested: 08/19/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 1 | 1 | 5/16mm | 0.31 | 31898.24 | 102898 | Service Splice | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 2 of 3
DIME Test ID: 2019-08-15-7-2
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/19/2019
Date Tested: 08/19/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 3 | 1 | 5/16mm | 0.31 | 32041.26 | 103359 | Service Splice | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72 f
|
Test 3 of 3
DIME Test ID: 2019-08-15-7-3
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Verified Date: 08/19/2019
Date Tested: 08/19/2019
Submitted By Organization: CT HQ - Sacramento Structural Materials Testing Laboratory
Organization Address: 5900 Folsom Boulevard,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: joshua.moore@dot.ca.gov
Organization Phone: (530) 329-6527
General Comments for this Test: Service Splice
Test Result Compliance:
Additional Comments When Verified:
Number of Samples
|
1
|
Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By | 2 | 1 | 5/16mm | 0.31 | 30158.13 | 97284 | Service Splice | fsaylor |
| |
UTM
|
400kip
|
Temperature
|
72 f
|