Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.
Project ID: 66667 DEA: JMFPP EFIS: 0019000043
QA Service Level:
DIST-CO-RTE-PM: 59---
Work Description: Special project for submitting Sample information for JMF Prequalification Program.
Location Description:
Contractor Name: Unknown
Contractor Address: Unknown
Resident Engineer: Unknown Structure Rep.: Unknown
DIME Sample ID: 2019-05-01-28
TL Number from the TL Form:
Sample Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Sample Organization Contact: (916) 227-7302
Type of Sample: Quality Control
Type of Material: Aggregate
Sample Taken Date: 05/01/2019
Date that the sample was received by the laboratory/organization performing the testing:
The quantity of what the sample constitutes: 1
A brief description of the sample: 1/2 " HMA-SP w/15% RAP
From where was the sample collected: Source
Laboratory sample identification:
Structure unique identifier:
Structure name:
The fabricator/manufacturer/facility name: Sierra Pacific - Avenal
Source Identification (SMARA, name of Pit or Job Site): 91-10-0006::AVENAL AGGREGATES
The fabricator's/manufacturer's product name for the sample:
The fabricator/manufacturer designation for the sample:
The plant number:
A detailed description of where the material sample was collected: Stockpile @ Plant
Where the material sample would have been placed if not sampled:
Primary Aggregate Nominal Size: fine
The concrete mix design number:
Lot number:
Sublot number:
Aggregate Mix Number:
DIME Test ID: 2019-05-01-28-1
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Verified Date: 08/06/2019
Date Tested: 05/01/2019
Submitted By Organization: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Organization Address: 5900 Folsom Boulevard, Room 225,
Organization City: Sacramento
Organization State: CA
Organization Zipcode: 95819
Organization Email: guadalupe.magana@dot.ca.gov
Organization Phone: (916) 227-7302
General Comments for this Test: T-27 RD
Test Result Compliance:
Additional Comments When Verified:
What type of gradation is being tested?
|
HMA Gradation
|
Cumulative percent passing the 1 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 1 in. sieve
|
100 %
|
Cumulative percent passing the 3/4 in. sieve
|
100 %
|
Cumulative percent passing the 1/2 in. sieve
|
100 %
|
Cumulative percent passing the 3/8 in. sieve
|
100 %
|
Cumulative percent passing the 1/4 in. sieve
|
100 %
|
Cumulative percent passing the #4 sieve
|
99 %
|
Cumulative percent passing the #8 sieve
|
80 %
|
Cumulative percent passing the #16 sieve
|
60 %
|
Cumulative percent passing the #30 sieve
|
47 %
|
Cumulative percent passing the #50 sieve
|
37 %
|
Cumulative percent passing the #100 sieve
|
29 %
|
Cumulative percent passing the #200 sieve
|
18 %
|