Print Report | Back to Sample Detail

Sample Record for 2019-06-13-12

Note: Fields with no data or with a value of "Unknown" will not be displayed on the print out.

Project Information

Project ID: 213267 DEA: 04013584 EFIS: 0416000289 QA Service Level: 1
DIST-CO-RTE-PM: 04-SF-80-8.0/8.3,0.9/1.4
Work Description: Pier Retention
Location Description: In San Francisco and Alameda Counties on Yerba Buena Island and .4 miles west of Oakland Toll plaza
Contractor Name: Kiewit/Manson, AJV
Contractor Address: 4650 Business Center Drive, Fairfield,CA 94804
Resident Engineer: Brian Boal Structure Rep.: Unknown

Sample Information

DIME Sample ID: 2019-06-13-12
TL Number from the TL Form:
Sample Submitted By Organization: CT SC - 3676 - 104
Sample Organization Contact:
Type of Sample: Verification
Type of Material: Concrete
Sample Taken Date: 06/13/2019
Date that the sample was received by the laboratory/organization performing the testing: 07/12/2019
The quantity of what the sample constitutes: 18 CY
A brief description of the sample: 6 6x12 Concrete Cylinders
From where was the sample collected: Job Site
Laboratory sample identification:
Structure unique identifier:
Structure name: YBI Observation Structure
The fabricator/manufacturer/facility name: Central Concrete Redwood City Plant

Material Information

The concrete mix design number: 4E01C5S1
The truck number from where the sample was collected: 8173
The batch plant ticket number from where the sample was collected: 18881778
Concrete batch plant: 30
The fabricator/manufacturer designation for the sample: Unknown
A detailed description of where the material sample was collected: Concrete Truck
Where the material sample would have been placed if not sampled: YBI Plaza
From Lot No.: Unknown
Bag Lot No.: Unknown

Test Results